x530L Series Installation Guide for Virtual Chassis Stacking
207
5. Verify the position of the handle on the transceiver. If the transceiver is
in a top port, the handle must be in the upright position, as shown in
Figure 93. If the transceiver is in a bottom port, the handle must be in
the down position.
Figure 93. Positioning the SFP or SFP+ Handle in the Upright Position
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 through 5 to
install the remaining transceivers in the switch.
6. Connect the fiber optic cable to the transceiver, as shown in Figure 94.
The connector on the cable must fit snugly into the port, and the tab
must lock the connector into place.
Figure 94. Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver
7. Repeat this procedure to install additional transceivers.
27/S1
25
SFP+
26
10G
/
1G
2
5G/2.5G/1G/100
4576
SFP Handle
27/S1
25
SFP+
26
10G
/
1G
2
5G/2.5G/1G/100
4577
Содержание x530L Series
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 56: ...Chapter 1 Overview 56 ...
Страница 60: ...Chapter 2 Virtual Chassis Stacking 60 When using a multi speed port as a stack port it supports 1 to 8 links ...
Страница 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Страница 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Страница 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...
Страница 210: ...Chapter 9 Cabling the Networking Ports 210 ...
Страница 228: ...Appendix A Technical Specifications 228 ...