Chapter 5: Installing the Switch in an Equipment Rack
112
You can also orient the switch with the rear panel facing the front of the
equipment rack. Refer to Figure 52.
Figure 52. Switch Orientations with the Rear Panel Facing the Front of the
Equipment Rack
Installing the
Switch
If you have not chosen an orientation for the switch in the equipment rack,
review “Switch Orientations in the Equipment Rack” on page 110.
Please review the installation guidelines in “Choosing a Site for the
Switch” on page 52 before installing the switch in an equipment rack.
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.
E28
To install the switch in a 19-inch equipment rack with the RKMT-J14
Brackets, perform the following procedure:
1. Attach the two handles to the RKMT-J14 Brackets using the four
M3x6mm screws included with the switch. Refer to Figure 53 on page
113.
Содержание x530L Series
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 56: ...Chapter 1 Overview 56 ...
Страница 60: ...Chapter 2 Virtual Chassis Stacking 60 When using a multi speed port as a stack port it supports 1 to 8 links ...
Страница 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Страница 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Страница 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...
Страница 210: ...Chapter 9 Cabling the Networking Ports 210 ...
Страница 228: ...Appendix A Technical Specifications 228 ...