Chapter 5: Verifying the Switch
76
Verifying the Switch
After powering on the switch and waiting two minutes for it to initialize the
management software, perform the following procedure to verify its
hardware operations:
1. Examine the Switch ID LED. As a standalone switch, it should be
displaying one of the values in Figure 42, depending on whether the
low power mode is on or off. If the LED is displaying the letter “F”, refer
to Chapter 7, “Troubleshooting” on page 85. For more information,
refer to “Switch ID LED” on page 31.
Figure 42. Verifying the Switch ID LED
2. Start a local or remote management session on the switch. Refer to
“Starting a Local Management Session” on page 73.
3. Enter the SHOW SYSTEM ENVIRONMENT command in the User
Exec or Privileged Exec mode.
4. Check the Status column. All components should have the “OK”
status.
For information about the command line interface, refer to the
Software Reference for x330 Series Switches, AlliedWare Plus
Operating System
on the Allied Telesis web site.
5. Go to Chapter 6, “Cabling the Networking Ports” on page 77.
Low Power
Mode Off
Low Power
Mode On
Содержание x330-10GTX
Страница 1: ...613 002996 Rev A x330 10GTX Gigabit Layer 3 Ethernet Switch Installation Guide...
Страница 6: ...6...
Страница 10: ...Figures 10...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 36: ...Chapter 1 Overview 36...
Страница 48: ...Chapter 2 Beginning the Installation 48...
Страница 82: ...Chapter 6 Cabling the Networking Ports 82 Figure 46 Connecting a Fiber Optic Cable to an SFP or SFP Transceiver...
Страница 88: ...Chapter 7 Troubleshooting 88...
Страница 98: ...Appendix A Technical Specifications 98...