IE340 Series

Industrial Ethernet Layer 3 Switches

IE340-12GP
IE340-12GT
IE340-20GP
IE340L-18GP

Installation Guide

Содержание IE340 Series

Страница 1: ...613 002725 Rev D IE340 Series Industrial Ethernet Layer 3 Switches IE340 12GP IE340 12GT IE340 20GP IE340L 18GP Installation Guide...

Страница 2: ...espective owners Allied Telesis Inc reserves the right to make changes in specifications and other information contained in this document without prior written notice The information provided herein i...

Страница 3: ...commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with this instruction manual may cause harmful interference to...

Страница 4: ...Not applicable to the IE340L 18GP switch Electromagnetic Immunity EN 55024 EN 61000 6 2 IEC 61000 3 22 IEC 61000 3 32 IEC 61000 4 2 level 3 IEC 61000 4 3 level 4 IEC 61000 4 4 level 4 IEC 61000 4 5 l...

Страница 5: ...te Sicherheitserkl rungen Wichtig Das zeigt an dass bersetzungen der Sicherheitserkl rung in den bersetzten PDF Sicherheitserkl rungen auf der Allied Telesis Website unter alliedtelesis com support ve...

Страница 6: ...dica che le traduzioni della dichiarazione di sicurezza sono disponibili nelle dichiarazioni di sicurezza tradotte in PDF pubblicate sul sito Web di Allied Telesis all indirizzo alliedtelesis com supp...

Страница 7: ...ss Tables 26 Management Software 26 Management Methods 26 Installation Options 26 Additional Features 26 Twisted Pair Ports 27 Connector Type 27 Speed 27 Duplex Mode 27 Maximum Distance 27 Cable Requi...

Страница 8: ...ng the Switch on an Indoor Concrete Wall 79 Installing the Switch in an Outdoor Environment 83 Requirements for Outdoor Installation 83 Immunity and Precautions 83 Lightning Protection Requirements 84...

Страница 9: ...Contents 9 RJ 45 Style Serial Console Port Pinouts 134 PWR 1 and PWR 2 DC Power Connectors 135 Device Dimensions 136...

Страница 10: ...IE340 Series Installation Guide 10...

Страница 11: ...the Switch 76 Figure 25 Installing the Wall Brackets on the Switch 77 Figure 26 Attaching the Switch to the Plywood Base 78 Figure 27 Marking the Locations of the Bracket Holes on a Concrete Wall 81 F...

Страница 12: ...the PWR 1 PWR 2 Connector 108 Figure 52 Initialization Messages 110 Figure 53 Initialization Messages Continued 111 Figure 54 Initialization Messages Continued 112 Figure 55 RJ 45 Port Pin Layout Fron...

Страница 13: ...12 Product Dimensions W x H x D 126 Table 13 Product Weights 126 Table 14 Ventilation Requirements for Cabinet Installation 126 Table 15 Minimum Cabinet Enclosure Dimensions 126 Table 16 Operating Te...

Страница 14: ...Tables 14...

Страница 15: ...in this Document on page 16 Contacting Allied Telesis on page 17 This guide contains the hardware installation instructions for the IE340 Series of Industrial Ethernet Layer 3 switches The switch mode...

Страница 16: ...tions inform you that performing or omitting a specific action may result in equipment damage or loss of data Warning Warnings inform you that performing or omitting a specific action may result in bo...

Страница 17: ...Authorizations RMAs and to contact Allied Telesis technical experts USA and EMEA phone support Select the phone number that best fits your location and customer type Hardware warranty information Lea...

Страница 18: ...IE340 Series Installation Guide 18...

Страница 19: ...ted Pair Ports on page 27 Power over Ethernet on page 29 SFP Slots on page 33 Console Port on page 34 USB Port on page 35 Reset Button on page 36 Ground Screw on page 36 PWR 1 and PWR 2 DC Power Conne...

Страница 20: ...except the IE340 12GT switch support PoE on the twisted pair ports and all models except the IE340L 18GP switch come with a USB port The IE340 switches are listed here IE340 12GP next IE340 12GT on p...

Страница 21: ...of the IE340 20GP Switch is shown in Figure 3 Figure 3 Front Panel of the IE340 20GP Switch 10 100 1000Base T twisted pair ports Slots for 100 1000Base X SFP transceivers Console management port USB...

Страница 22: ...the components on the top panels of the IE340 12GP IE340 20GP and IE340L 18GP switches Figure 5 Top Panel of the IE340 12GP IE340 20GP and IE340L 18GP Switches 10 100 1000Base T twisted pair ports Slo...

Страница 23: ...12GT Switch Back Panel Figure 7 identifies the components on the back panel Figure 7 Back Panel PWR 2 DC power connector PWR 1 DC power connector Alarm In connector Alarm Out connector Grounding scre...

Страница 24: ...ames up to 9KB RJ 45 connectors Power Over Ethernet PoE The following IE340 switches are PoE Power Sourcing Equipment PSE IE340 12GP IE340 20GP IE340L 18GP They have these PoE features All twisted pai...

Страница 25: ...abnormal conditions Reverse input voltage polarity Over and under voltage Over current Peak current and short circuit Over temperature Alarm Monitoring The alarm facility lets you monitor the switch...

Страница 26: ...nterfaces AlliedWare Plus management software version 5 4 9 or later Command line interface Web browser interface Management Methods You can manage the switches in the following ways Local management...

Страница 27: ...or full duplex mode at 10 or 100 Mbps Ports operating at 1000 Mbps can only operate in full duplex mode The twisted pair ports are IEEE 802 3u Auto Negotiation compliant The switch can set the duplex...

Страница 28: ...ever they are not recommended for IEC61000 6 2 and EN50121 4 immunity levels Note A Category 6 or 6a shielded or unshielded cable is required to meet IEC61000 6 2 and EN50121 4 immunity levels Automat...

Страница 29: ...ireless access points IP telephones web cams and even other Ethernet switches A PD connected to a port on the switch receives both network traffic and power over the same twisted pair cable PoE Versio...

Страница 30: ...o methods for delivering power over twisted pair cables from power sources such as the Ethernet switch to powered devices The methods called Alternatives A and B identify the wire strands that carry t...

Страница 31: ...rt at one time depends on the switch s PoE budget and the wattage requirements of the powered devices To determine whether the wattage requirements of the PoE devices you plan to connect to the switch...

Страница 32: ...his level receive power only if all the ports set to the Critical level are already receiving power If there is not enough power to support all of the ports set to the High priority level power is pro...

Страница 33: ...ted Ethernet transceivers To protect SFP transceivers from heat related damage you should select transceivers whose maximum operating temperatures exceed the anticipated maximum ambient temperature at...

Страница 34: ...quire the following items Terminal or a personal computer with a terminal emulation program Management cable The switch comes with a management cable If you need a replacement cable you can purchase o...

Страница 35: ...en switches Store or transfer log files Store or transfer debug files for example the output of the SHOW TECH SUPPORT command Boot the AlliedWare Plus management software and master configuration file...

Страница 36: ...boot process Some network traffic may be lost E113 Note It takes approximately one minute during the reboot process Note Unsaved changes to the configuration settings of the switch are discarded when...

Страница 37: ...r power redundancy which protects the device from power loss in the event a DC power unit fails or loses power The switches support the following types of power sources AC DC rectifiers Un interruptib...

Страница 38: ...while an open circuit is off preventing the flow of voltage through the circuit The switch performs one or more of the following functions when the state of the external sensor changes to open or clos...

Страница 39: ...command The command configures the switch to generate an alarm when the state of the sensor changes from closed to open awplus config alarm facility input alarm 1 alarm position open The alarm remain...

Страница 40: ...larm position close The command configures the switch to signal the alarm when the sensor changes to closed above 30 C When the temperature falls below 30 C and the temperature sensor changes from clo...

Страница 41: ...ower specifications for the circuit 30VDC maximum 0 5A maximum Caution The external alert device must not exceed the above specifications The Alarm Out connector can be damaged by devices that exceed...

Страница 42: ...circuit turns on the LED When the switch detects that all its ports have links again it closes the circuit which turns off the LED Note Alarm devices are not available from Allied Telesis Figure 10 Ex...

Страница 43: ...owed by a pause The switch is experiencing an alarm condition Use the SHOW FACILITY ALARM STATUS command to view active alarms The ALARM FACILITY command in the Global Configuration mode is the comman...

Страница 44: ...t the power exceeds the maximum voltage The maximum voltage depends upon the operating mode PWR2 Off The switch is not receiving power on the PWR 2 connector or the input power from the DC power suppl...

Страница 45: ...rt is delivering power to a powered device Solid Amber The port is connected to a powered device but the switch has shutdown PoE on it because of a fault condition Flashing Amber The port is connected...

Страница 46: ...has established a 1000 Mbps link to a network device Flashing Green The port is transmitting or receiving data at 1000 Mbps Solid Amber The port has established a 10 or 100 Mbps link to a network devi...

Страница 47: ...rt is transmitting or receiving data at 1000 Mbps Solid Amber The port has established a 10 or 100 Mbps link to a network device Flashing Amber The port is transmitting or receiving data at 10 or 100...

Страница 48: ...for IE340L 18GP Model State Description Solid Green The port has established a 1Gbps link to a network device Flashing Green The port is transmitting or receiving network packet traffic at 1Gbps Off...

Страница 49: ...ply endures harsh environments such as those found in industrial applications Here are main features 480W output power Wide input voltage range 85 264Vac Wide operating temperature range 25 70 C Elect...

Страница 50: ...ust not exceed 57Vdc to avoid the device breakdown DC input current has to be available continuously over the operating temperature range and required consumption Note The IE340 switches can be powere...

Страница 51: ...for the powered devices PD Table 9 Input Voltage Requirements Mode Input Voltage Range Input Voltage Recommended Over voltage Alarm Non PoE IE340 12GP IE340 12GT IE340 20GP 18 0 to 57 0 VDC 24 VDC 48...

Страница 52: ...IE340 Series Installation Guide 52...

Страница 53: ...llation The chapter contains the following sections Reviewing Safety Precautions on page 54 Safety Precautions When Working with Electricity on page 58 Reviewing Site Requirements on page 59 Unpacking...

Страница 54: ...1M Laser product L9 Warning Do not stare into the laser beam L2 Warning Do not look directly at the fiber optic ends or inspect the cable ends with an optical lens L6 Warning To prevent electric shock...

Страница 55: ...ance from the building primary bonding point to earth should be less than 5 ohms Caution Air flow around the unit and through the cooling fins must not be restricted E20 Note All Countries Install pro...

Страница 56: ...ers with unprotected hands E43 Caution An Energy Hazard exists inside this equipment Do not insert hands or tools into open chassis slots or plugs E44 Warning This equipment shall be installed in a Re...

Страница 57: ...57 Note The equipment meets EN61000 4 5 Class 3 on the DC inputs and Ethernet ports Note Allied Telesis does not warrant against lightning or power surges damaging the device Such damage will be the r...

Страница 58: ...me that the power is disconnected from a circuit always check the circuit Inspect the work area carefully for possible hazards such as moist floors ungrounded power extension cables frayed power cord...

Страница 59: ...a wall that has metal studs Metal studs might not be strong enough to safely support the device You should not install the switch on sheetrock or similar material Sheetrock might not be strong enough...

Страница 60: ...ch in an metal enclosure be sure to review the manufacturer s installation guide for rules and restrictions on site requirements and to follow all guidelines and safety warnings The switch and DC powe...

Страница 61: ...nt lights Allied Telesis recommends using CAT6 STP or UTP for LAN ports These cables provide higher protection from radio frequency interference Outdoor installation requires adequate electromagnetic...

Страница 62: ...IE340 Series Installation Guide 62 Figure 13 Space Issue Between SFP Module and Copper Port...

Страница 63: ...perform the following procedure 1 Remove all the components from the shipping box Refer to Figure 14 Note Store the packaging material in a safe location You must use the original shipping material i...

Страница 64: ...e it on a level secure surface Refer to Figure 15 Figure 15 Removing the Switch from the Anti static Bag 3 Verify that the shipping container includes the items shown in Table 11 on page 65 Figure 16...

Страница 65: ...ponents 3 1 2 2 4 7 5 6 Table 11 Shipping Package Contents Shipping Component IE340 12GP IE340 12GT IE340 20GP IE340L 18GP Number of the Components 1 Dust cover on the USB port Pre installed 1 1 N A 2...

Страница 66: ...1 1 1 5 2 pin connectors on the ALM IN and ALM OUT connectors Pre installed 2 2 2 6 4 pin connector on the DC power PWR 1 and PWR 2 connectors Pre installed 1 1 1 7 DIN rail bracket Pre installed 1 1...

Страница 67: ...2 2 M4x8 Phillips head screws 5 5 5 2m 6 6ft local management cable with RJ 45 8P8C and DB0 D sub 9 pin connectors 1 1 1 Table 11 Shipping Package Contents Continued Shipping Component IE340 12GP IE34...

Страница 68: ...IE340 Series Installation Guide 68...

Страница 69: ...this chapter are listed here Installing the Switch on a DIN Rail on page 70 Installing the Switch on an Indoor Wooden Wall on page 73 Installing the Switch on an Indoor Concrete Wall on page 79 Instal...

Страница 70: ...le with DIN 35 x 7 5mm rails Figure 17 shows the switch installed on a DIN rail Figure 17 The Switch Installed on a DIN Rail Figure 18 shows the proper orientation of the switch on a DIN rail Do not i...

Страница 71: ...om of the switch towards the wall and hook the bottom of the switch bracket on the bottom edge of DIN rail Figure 19 Installing the Switch on a DIN Rail 1 3 While pressing the switch upwards to compre...

Страница 72: ...Refer to Figure 21 Figure 21 Verifying the DIN Rail Installation Note Allied Telesis recommends installing DIN rail end clamps to the sides of the switch to prevent damage or network traffic loss fro...

Страница 73: ...ronment Warning The IE048 480 power supply and other non compliant UL EN IEC 61010 1 and 61010 2 201 power supplies must be installed in fire protection enclosures when installed on walls of combustib...

Страница 74: ...11 inches Thickness 2 6 centimeters 1 inch The dimensions assume the wall studs are 41 centimeters 16 inches apart the industry standard You may need to adjust the width of the base if the distance be...

Страница 75: ...ackets is 4 5 mm 0 17 in Four screws and anchors for attaching the plywood base to the wall not provided Installing the Plywood Base A plywood base is recommended when installing the switch on a wall...

Страница 76: ...erforming this procedure Warning The device is heavy Always ask for assistance before moving or lifting it to avoid injuring yourself or damaging the equipment E122 To install the switch on the plywoo...

Страница 77: ...on the wall while you secure it with four screws not provided Refer to Figure 26 on page 78 Please follow these guidelines as you position the switch on the wall The switch must be oriented as shown i...

Страница 78: ...IE340 Series Installation Guide 78 Figure 26 Attaching the Switch to the Plywood Base 5 Go to Chapter 4 Cabling the Ports on page 87...

Страница 79: ...ol or Laboratory environment Warning The IE048 480 power supply and other non compliant UL EN IEC 61010 1 and 61010 2 201 power supplies must be installed in fire protection enclosures when installed...

Страница 80: ...ing the pre installed DIN rail bracket and remove the bracket Refer to Figure 24 on page 76 3 Install the two brackets that come with the switch to the back panel of the unit Refer to Figure 25 on pag...

Страница 81: ...Please review the following guidelines Prior to drilling set the drill to hammer and rotation mode The modes break up the concrete and clean out the hole Allied Telesis recommends cleaning out the ho...

Страница 82: ...IE340 Series Installation Guide 82 Figure 28 Installing the Switch on a Concrete Wall 9 Go to Chapter 4 Cabling the Ports on page 87...

Страница 83: ...nclosure material paint color mounting method wall pole ground etc and sun load The smaller enclosure size you choose the higher risk of overheating the product faces If the product overheats in an en...

Страница 84: ...ed earthing rod should not exceed 0 01 ohms Grounding electrode system must efficiently move the lightning to its final destination away from the structure and its contents The resistance of the commo...

Страница 85: ...of the plant or those responsible for the installation should apply the necessary measures e g shielding bonding and grounding protection to ensure that the interference voltages caused by lighting s...

Страница 86: ...IE340 Series Installation Guide 86...

Страница 87: ...87 Chapter 4 Cabling the Ports This chapter contains the following procedures Cabling the Twisted Pair Ports on page 88 Installing SFP Transceivers on page 90...

Страница 88: ...for ports connected to network devices that also support Auto Negotiation for duplex modes The default duplex mode setting of Auto Negotiation is not appropriate for ports connected to network devices...

Страница 89: ...ually set it to MDI X If you are using crossover twisted pair cable the wiring configurations of a port on the switch and a port on a network device must be the same Ethernet cables that are connected...

Страница 90: ...a transceiver from a slot in the switch might require slightly more force than typically required with other network equipment This is because of the design of the SFP cages When you use an SFP module...

Страница 91: ...1 Figure 29 Removing the Dust Plug from an SFP Slot 2 Remove the transceiver from its shipping container and store the packaging material in a safe location 3 Position the transceiver with its handle...

Страница 92: ...cover from the transceiver Refer to Figure 31 Figure 31 Removing the Dust Cover from an SFP Transceiver 5 Verify the handle on the transceiver is turned to the right Refer to Figure 32 Figure 32 Verif...

Страница 93: ...Cabling the Ports 93 Figure 33 Connecting a Fiber Optic Cable to an SFP Transceiver 7 Repeat this procedure to install and cable the remaining transceivers 8 Go to Chapter 5 Powering On the Switch on...

Страница 94: ...IE340 Series Installation Guide 94...

Страница 95: ...cting the Grounding Wire on page 96 Wiring the ALM IN and ALM OUT Connectors on page 99 Preparing the DC Power Cables on page 104 Powering On the Switch on page 108 Monitoring the Initialization Proce...

Страница 96: ...onnected to a properly earthed bonding point E120 To connect the grounding wire with bare wire perform the following procedure 1 Strip 2 54cm 1 0 in of insulation from the end of the solid grounding w...

Страница 97: ...nding Screw 3 Wrap the grounding wire clockwise around the base of the grounding screw Refer to Figure 36 Figure 36 Wrapping the Grounding Wire Around the Grounding Screw 4 Tighten the screw to secure...

Страница 98: ...to the Switch 5 Connect the other end of the ground wire to a ground point at the installation site 6 Do one of the following To wire the alarm connectors go to Wiring the ALM IN and ALM OUT Connecto...

Страница 99: ...r It must be a dry contact It must not place any current on the circuit It must not use the voltage or current from the switch on the circuit for its own operations It must be able to handle a minimum...

Страница 100: ...nnector perform the following procedure 1 Strip 6 5mm 0 25 in of insulation from the ends of the wires with a wire insulator stripper Refer to Figure 39 Figure 39 Stripping an Alarm Wire Warning Do no...

Страница 101: ...strands This guide does not provide instructions on how to tin wires 3 Remove the alarm connector from the top panel Figure 41 shows the removal of the ALM OUT connector Figure 41 Removing an Alarm C...

Страница 102: ...rify that there are no exposed wires or loose wire strands Refer to Figure 50 on page 107 Warning Check to see if there are any exposed copper strands coming from the installed wires When this install...

Страница 103: ...o the Alarm Connector 8 Connect the other end of the wires to an external sensor for the Alarm In connector or an alert device for the Alarm Out connector 9 If necessary repeat this procedure to wire...

Страница 104: ...If you are installing only one power supply to the switch you may connect it to either the PWR 1 or PWR 2 connector Figure 45 Pin Signals Legends for the PWR 1 and PWR 2 Connectors Here are the mater...

Страница 105: ...ightly wrap the wire strands with your finger tips Refer to Figure 40 on page 101 This step is to prevent loose strands from touching other wires and causing an electrical short Note Allied Telesis re...

Страница 106: ...onnector 5 Insert the wires into the connector and tighten the retaining screws to secure the wires Refer to Figure 49 Allied Telesis recommends tightening the screws to 2 to 3 in lbs Figure 49 Insert...

Страница 107: ...led wires When this installation is done correctly there should be no exposed copper wire strands extending from the terminal block Any exposed wiring can conduct harmful levels of electricity to pers...

Страница 108: ...before powering on the unit For more information on the feature refer to the Software Reference for the IE340 Switches For power supply requirements refer to Power Supplies on page 49 To power on the...

Страница 109: ...resolve it The Fault LED should be off One or both PWR 1 and PWR 2 LEDs should be solid green depending on the number of DC power supplies connected to the unit The LEDs on SFP slots with transceiver...

Страница 110: ...Figure 52 Initialization Messages Verifying release OK Booting Uncompressing Linux done booting the kernel Starting base first OK Mounting virtual filesystems OK Allied Telesis Inc AlliedWare Plus TM...

Страница 111: ...rting network hostcfg OK Received event hostcfg done Starting network cmlplatformd OK Starting base eventwatch OK Starting network startup OK Starting hardware platform_eventd OK Starting network licd...

Страница 112: ...ies Installation Guide 112 Figure 54 Initialization Messages Continued Received event network activated Loading configuration file flash test1 cfg please wait done Received event network activated awp...

Страница 113: ...ed an IP address for local management sessions You cannot initially manage the switch remotely with Telnet SSH or web browser because the switch does not have a default IP address and the DHCP client...

Страница 114: ...manager account 5 Enter the user name and password The default values are manager and friend without the quotes respectively Note User names and passwords are case sensitive The switch starts the loc...

Страница 115: ...orm the following procedure 1 Enter the ENABLE command at the User Exec mode to move to the Privileged Exec mode as shown here awplus enable awplus 2 Enter the SHOW POWER INLINE command at the Privile...

Страница 116: ...al budget the switch may experience problems For instance it may attempt to distribute more power than it actually has available from the power supply or display the PoE Status LEDs incorrectly The de...

Страница 117: ...e terminal awplus config 5 In the Global Configuration mode enter the POWER INLINE WATTAGE MAX command to change the nominal value to be either equal to or less than the actual wattage value The forma...

Страница 118: ...IE340 Series Installation Guide 118...

Страница 119: ...blems with the switch The sections in the chapter are listed here PWR 1 and PWR 2 LEDs on page 120 Twisted Pair Ports on page 121 SFP Slots on page 123 Power Over Ethernet on page 124 Note For further...

Страница 120: ...lies on page 49 Verify that the PWR 1 PWR 2 connector is fully inserted into the slot in the top panel of the switch Verify that the DC wires are securely connected to the PWR 1 PWR 2 connector on the...

Страница 121: ...ossibility that the port is connected to the wrong network device Verify that the network device connected to the twisted pair port is powered on and is operating properly Verify that the network cabl...

Страница 122: ...This can occur when a twisted pair port using Auto Negotiation is connected to a remote device that has a fixed speed of 10 or 100 Mbps and a fixed duplex mode of full duplex If this is the cause of t...

Страница 123: ...e are compatible Verify that the correct type of fiber optic cabling is being used Verify that the port is connected to the correct fiber optic cable This is to eliminate the possibility that the port...

Страница 124: ...ue from the Power Allocated value to determine the amount of unused power The switch cannot support the powered device if this value is less than the device s power requirements Verify that you are us...

Страница 125: ...Physical Specifications on page 126 Environmental Specifications on page 128 Power Specifications on page 130 RJ 45 Twisted Pair Port Pinouts on page 132 RJ 45 Style Serial Console Port Pinouts on pa...

Страница 126: ...l bracket 2 34 kg 5 16 lbs IE340 switch with wall brackets 2 23 kg 4 91 lbs Table 14 Ventilation Requirements for Cabinet Installation Minimum Open Space Below Switch 5 08 cm 2 0 in Minimum Open Space...

Страница 127: ...equipment sealed or unsealed enclosure type enclosure material paint color mounting method wall pole ground etc and sun load The smaller enclosure size you choose the higher risk of overheating the pr...

Страница 128: ...o 158 F 40 C to 75 C 40 F to 167 F IE340 12GT 40 C to 75 C 40 F to 167 F IE340 20GP 40 C to 65 C 40 F to 149 F 40 C to 70 C 40 F to 158 F 40 C to 75 C 40 F to 167 F IE340L 18GP 40 C to 65 C 40 F to 14...

Страница 129: ...installed in a UL Listed or Nationally Recognized Test Lab enclosure when used in an indoor Measurement Control or Laboratory environment as specified in UL EN IEC 61010 1 and 61010 2 201 Note The IE...

Страница 130: ...cility capacity planning Table 19 Input Voltage Specifications Switch PoE PoE Non PoE IE340 12GP 46 57VDC 52 5 57VDC 18 57VDC IE340 20GP 18 57VDC IE340L 18GP 46 57VDC IE340 12GT N A N A 18 57VDC Table...

Страница 131: ...ions 131 AA Note For ALARM IN and ALARM OUT wiring specifications see Wiring the ALM IN and ALM OUT Connectors on page 99 Table 22 ALM IN and ALM OUT Power Ratings ALARM OUT 30VDC maximum 0 5A maximum...

Страница 132: ...pair port Figure 55 RJ 45 Port Pin Layout Front View Table 23 lists the pin signals for a port when it is operating at 10 or 100 Mbps Table 23 Pin Signals for 10 and 100 Mbps Pin MDI Signal MDI X Sign...

Страница 133: ...ical Specifications 133 Table 24 lists the pin signals for a port when it operating at 1000 Mbps Table 24 Pin Signals for 1000 Mbps Pinout Pair 1 Pair 1 2 Pair 1 3 Pair 2 4 Pair 3 5 Pair 3 6 Pair 2 7...

Страница 134: ...45 connector on the Console port Figure 56 Console Port Pin Layout Front View Table 25 lists the pin signals for the RJ 45 style serial Console port Table 25 RJ 45 Style Console Port Pin Signals Pin...

Страница 135: ...wer Connectors Table 26 PWR 1 and PWR 2 DC Connector Pin Signals on the IE340 12GP IE340 12GT and IE340 20GP Switches Pin Signal 24 48 54 VDC VDC Return Table 27 PWR 1 and PWR 2 DC Connector Pin Signa...

Страница 136: ...36 Device Dimensions Figure 57 IE340 Switch Dimensions 153 6 024 91 3 583 138 254 5 443 139 5 472 174 225 6 859 192 7 559 35 1 378 96 3 3 791 17 6125 693 7 276 18 2 717 66 2 598 44 1 732 35 1 378 56 7...