
14
GS950PS V2 Series Quick Installation Guide
Do not attach cables to ports of static or LACP port trunks until
after configuring the switch trunks. This is to prevent the ports
from forming network loops that can adversely affect network
performance.
PoE+ is enabled by default on the ports on the switches.
Installing SFP Transceivers
Here are general installation guidelines:
You can install SFP transceivers while the switch is powered on.
For a list of supported transceivers, refer to the product’s data
sheet on the Allied Telesis web site at
.
The operational specifications and fiber optic cable requirements
are included with the transceivers.
Install the transceivers before connecting their fiber optic cables.
Fiber optic transceivers are dust sensitive. Always keep the dust
cover in the optical ports when a fiber optic cable is not installed.
Unnecessary removal and insertion of transceivers can lead to
premature failures.
To install SFP transceivers, perform the following procedure:
1. To install a transceiver in a top port, position it with the Allied
Telesis label facing up. To install it in a bottom port, position it
with the label facing down.
Warning:
Transceivers can be damaged by static
electricity. Be sure to observe all standard electrostatic
discharge (ESD) precautions, such as wearing an
antistatic wrist strap, to avoid damaging the devices.
E86