x930 Series Installation Guide for Virtual Chassis Stacking
183
What to Do Next
for Member
Switches
After configuring the member switch, do the following:
1. Power off the member switch.
2. Repeat these procedures to configure all member switches, assigning
each one a unique ID number and identifying the Gigabit ports of the
trunk.
3. If you have not already configured the master switch, perform
“Configuring the Master Switch” on page 170.
4. Power off the master and all member switches.
5. Cable the Gigabit ports of the trunk on the master and member
switches. Refer to “Cabling Copper Ports” on page 186. For trunks of
SFP ports on AT-x930-28GSTX Switches, refer to “Installing SFP and
SFP+ Transceivers” on page 188. For cabling examples, refer to
“Trunks of Copper 10/100/1000Mbps Ports” on page 67 and “Trunks of
SFP Ports on AT-x930-28GSTX Switches” on page 69.
6. Perform “Powering on the Stack” on page 184.
7. Perform “Verifying the Stack and Assigning Priority Numbers” on
page 156 to confirm that the switches formed the stack.
8. Cable the networking ports, as explained in Chapter 14, “Cabling the
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...