x930 Series Installation Guide for Virtual Chassis Stacking
125
Plywood Base for a Wall with Wooden Studs
If you are installing the switch on a wall that has wooden studs, Allied
Telesis recommends using a plywood base to attach the device to the
wall. (A plywood base is not required for a concrete wall.) Refer to
Figure 59. Switch on the Wall with a Plywood Base
Wall Studs
Wall
Plywood Base
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...