![Allied Telesis AT-x550-18XSPQm Скачать руководство пользователя страница 155](http://html.mh-extra.com/html/allied-telesis/at-x550-18xspqm/at-x550-18xspqm_installation-manual_2902942155.webp)
AT-x550 Series Installation Guide for Virtual Chassis Stacking
155
What to Do Next
After configuring the master switch, do the following:
1. Power off the switch by disconnecting its AC power cords from the AC
power sources. Refer to Figure 76 on page 155.
Figure 76. Powering Off the Switch
2. Configure the member switches. Refer to “Configuring Member
4
Enter the SHOW RUNNING-CONFIG command to display the running configuration
of the master switch.
awplus# show running-config
Use the display to confirm that you designated the correct trunk ports for the master
and member switches. The ports should be designated with INTERFACE PORT and
STACKPORT commands. In the following example, ports 15 and 16 on the master
and member switches will be the stack trunk:
interface port1.0.15-1.0.16
stackport
.
interface port2.0.15-2.0.16
stackport
.
interface port3.0.15-3.0.16
stackport
.
interface port4.0.15-4.0.16
stackport
5
Go to “What to Do Next” on page 155.
Table 23. Verifying the Master Switch (Continued)
Step
Description and Command
Содержание AT-x550-18XSPQm
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 50: ...Chapter 1 Overview 50 ...
Страница 78: ...Chapter 2 Virtual Chassis Stacking 78 ...
Страница 90: ...Chapter 3 Beginning the Installation 90 ...
Страница 110: ...Chapter 4 Installing the Switch on a Table or in an Equipment Rack 110 ...
Страница 124: ...Chapter 5 Installing the Switch on a Wall 124 ...
Страница 190: ...Appendix A Technical Specifications 190 ...