
AT-IE510-28GSX Installation Guide
75
Installing SFP and SFP+ Modules
To install SFP and SFP+ transceivers, perform the following procedure:
1. Remove the dust plug from a transceiver slot on the switch. Refer to
Figure 34. Removing the Dust Plug from a Transceiver Slot
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in a top slot, position the transceiver
with the Allied Telesis label facing up. If you are installing the
transceiver in a bottom slot, position the transceiver with the label
facing down.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Содержание AT-IE510-28GSX
Страница 1: ...613 002101 Rev C AT IE510 28GSX Industrial Ethernet Switch Installation Guide ...
Страница 6: ...6 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44 ...
Страница 60: ...Chapter 4 Mounting the Switch 60 ...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72 ...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78 ...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88 ...
Страница 116: ...Chapter 10 Powering On the Stack 116 ...
Страница 120: ...Chapter 11 Troubleshooting 120 ...
Страница 126: ...Appendix A Technical Specifications 126 ...