Installing the Switch in an Equipment Rack
This procedure requires the following items:
Eight bracket screws (included with the switch)
Two equipment rack brackets (included with the switch)
Flat-head screwdriver (not provided)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
Installation guidelines can be found in “Choosing a Site for the Switch” on
page 58. Here is the procedure for installing the switch in a 19-inch
equipment rack.
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.
E28
1. Place the unit upside down on a level, secure surface. Refer to
Figure 21. Turning the Switch Upside Down
2. Using a flat-head screwdriver, pry the rubber feet from the bottom of
the switch. Refer to Figure 22.
Figure 22. Removing the Rubber Feet
Содержание AT-FS970M/16F8-LC
Страница 8: ...Figures 8...
Страница 10: ...Tables 10...
Страница 14: ...Preface 14...
Страница 48: ...Overview 48 Figure 17 System LED System ID LED...
Страница 62: ...Beginning the Installation 62...
Страница 68: ...Installing the Switch on a Table or in an Equipment Rack 68 Figure 25 Attaching the Equipment Rack Brackets...
Страница 70: ...Installing the Switch on a Table or in an Equipment Rack 70...
Страница 78: ...Cabling the Networking Ports 78...
Страница 96: ...Troubleshooting 96...