
FS970M Series Installation Guide
59
Unpacking the Switch
Refer to the following figures to verify the contents of the shipping
containers of the switches: If any item is missing or damaged, contact your
Allied Telesis sales representative for assistance.
Note
You should retain the original packaging material in the event you
need to return the unit to Allied Telesis
The AT-FS970M/8, AT-FS970M/8PS, AT-FS970M/8PS-E, and
AT-FS970M/24C Switches come with the components listed in Figure 18.
Figure 18. Components of the AT-FS970M/8, AT-FS970M/8PS,
AT-FS970M/8PS-E, and AT-FS970M/24C Switches
One short rack mounting bracket
One long rack mounting bracket
One 2 m (6.6 ft) local management cable with
RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
connectors.
Eight bracket screws
One regional AC power cord
Содержание AT-FS970M/16F8-LC
Страница 8: ...Figures 8...
Страница 10: ...Tables 10...
Страница 14: ...Preface 14...
Страница 48: ...Overview 48 Figure 17 System LED System ID LED...
Страница 62: ...Beginning the Installation 62...
Страница 68: ...Installing the Switch on a Table or in an Equipment Rack 68 Figure 25 Attaching the Equipment Rack Brackets...
Страница 70: ...Installing the Switch on a Table or in an Equipment Rack 70...
Страница 78: ...Cabling the Networking Ports 78...
Страница 96: ...Troubleshooting 96...