background image

AT-9900s Series Switch Expansion Modules

10

Installation Procedure

Before you begin:

Unpack the expansion module.

In an anti-static environment, remove the expansion module from its packing 
material. Be sure to observe ESD precautions. 

Caution

Failure to observe proper anti-static procedures may damage the 

unit. If you are unsure about correct procedures, contact your authorised 
Allied Telesyn distributor or reseller.

Verify the package contents if you have not already done so.

See 

“Package Contents” on page 4

. If any items are damaged or missing, 

contact your authorised distributor or reseller.

Read the safety information for the switch.

Safety information is available in the Installation and Safety Guide that is on 
the CD-ROM for the AT-9900s switch. Or you can download this document 
from 

www.alliedtelesyn.co.nz/documentation

.

Gather necessary tools.

You may need a Phillips #2 screwdriver to adjust the retaining screws on a 
blank faceplate. 

Procedure

If you want to swap expansion modules, first save your configuration file as 
necessary (

create config

 and 

set config

 commands).

1.

If connected, disconnect the switch from its redundant power supply.

2.

Disconnect the switch from its AC or DC power supply.

3.

Loosen the thumbscrews to the faceplate or existing expansion module, 
and remove it.

Keep the faceplate for future use. If you remove the expansion module, 
cover the bay with the faceplate to prevent dust and debris from entering it 
and to maintain proper airflow

.

4.

Carefully slide the module into the empty bay until you feel it engage the 
rear plug.

Содержание AT-9900s Series

Страница 1: ...AT 9900s Switches Expansion Module Installation Guide AT A60 AT A61 AT A62...

Страница 2: ...ment without prior written notice The information provided herein is subject to change without notice In no event shall Allied Telesyn Inc be liable for any incidental special indirect or consequentia...

Страница 3: ...Installation Guide 3 Contents Models Covered by this Guide 4 Package Contents 4 Overview 4 XFP Port 5 SFP Ports 7 RJ 45 Ports 9 Installation Procedure 10 Documentation 11...

Страница 4: ...expansion modules XEMs These modules enable economical combinations of speed and port density with the AT 9900s Series gigabit link aggregation switch For example add one 10GbE expansion module to pr...

Страница 5: ...ule Front view AT A60 The following LEDs report operations on AT A60 expansion modules LED State Description L A Link Activity Green An XFP transceiver is installed and a 10Gb link has been establishe...

Страница 6: ...eiver modules contact an authorised distributor or reseller Product No Media Type Description AT XPSR 10GBASE SR 850nm short haul transmission 300m with MMF AT XPLRM 10GBASE LRM 1310nm short haul tran...

Страница 7: ...in the Software Reference for the switch Front view AT A61 The following LEDs report operations on AT A61 expansion modules LED State Description L A Link Activity Green An SFP transceiver is install...

Страница 8: ...iber 2m to 275m with 62 5 125 m fiber LC connector AT SPLX10 1000BASE LX 1310nm 2m to 10km with 9 m SM fiber 2m to 550m with 50 m MM fiber 2m to 550m with 62 5 m MM fiber LC connector AT SPLX40 1000BA...

Страница 9: ...or the switch Front view AT A62 The following LEDs report operations on AT A62 expansion modules LED State Description L A Link Activity Green A 1000Mbps link has been established Green flashing 1000M...

Страница 10: ...nstallation and Safety Guide that is on the CD ROM for the AT 9900s switch Or you can download this document from www alliedtelesyn co nz documentation Gather necessary tools You may need a Phillips 2...

Страница 11: ...tation as well as tools to manage it The CD includes the Hardware Reference which provides detailed information on the switch and its hardware features the Installation and Safety Guide which describe...

Отзывы: