2-1
Chapter 2
Installation and Setup
This chapter describes the following:
"
How to decide where to install the switch
"
Gigabit Ethernet configuration rules
"
How to install the switch in a rack or free-standing
"
How to connect equipment to the console port
"
How to check the installation using the Power On Self-Test (POST)
Following Safety Information
Before installing or removing any components of the switch, or before carrying out
any maintenance procedures, you must read the safety information provided in
Appendix A of this guide.
Verifying the Switch Package
Check your package for the following contents:
"
One gigabit Ethernet switch (AT-9108, AT-8518, AT-8525 or AT-8550)
"
Two rackmount brackets and eight flathead screws
"
Four self-adhesive rubber feet
"
One power cord
"
This installation guide
"
One warranty card
If any of the above items are damaged or missing, contact your Allied Telesyn
representative.
Содержание AT-8518
Страница 1: ...Gigabit Switches AT 9108 AT 8518 AT 8525 AT 8550 Installation Guide Version 4 x...
Страница 2: ......
Страница 3: ...AT 9108 AT 8518 AT 8525 AT 8550 Gigabit Switches Installation Guide PN 613 10841 00 Rev A...
Страница 28: ......
Страница 30: ......
Страница 34: ......
Страница 38: ......
Страница 40: ......
Страница 42: ......