![Allied Telesis AT 8000/8POE Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/allied-telesis/at-8000-8poe/at-8000-8poe_installation-manual_2902813036.webp)
Chapter 2: Installation
36
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Ensure the following hardware components are included in your switch
package. If any item is missing or damaged, contact your Allied
Telesyn sales representative for assistance.
Two rack-mount brackets
Eight rack-mount bracket screws (black)
Four rack-mounting screws (stainless steel)
Four rubber feet (for desktop use)
One management cable
One power cord
Documentation CD
Содержание AT 8000/8POE
Страница 1: ...613 000238 Rev C Layer 2 Fast Ethernet Switch AT 8000 8POE Installation Guide ...
Страница 8: ...Figures 8 ...
Страница 10: ...Tables 10 ...