Chapter 2: Installation
36
Monitoring the initialization processes
It takes about thirty seconds for the switch to initialize its management
software programs and features, and load the default configuration.
You may also monitor the bootup sequence by connecting a terminal or
computer that has a terminal emulator program, to the console port on the
master switch. You will see the messages from Figure 24 below to Figure
26 on page 40.
Figure 24. Switch initialization messages
Verifying release... OK
Booting...
Starting base/first... [ OK ]
Mounting virtual filesystems... [ OK ]
______________ ____
/\ \ / /______\
/ \ \_ __/ /| ______ |
/ \ | | / | ______ |
/ \ \ / / \ ____ /
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v0.0.0
Current release filename:x220-5.4.8.rel
Built: Fri Mar 23 07:06:12 UTC 2018
Mounting static filesystems... [ OK ]
Attaching to /dev/mtd0... [ OK ]
Mounting file system... [ OK ]
Checking for last gasp debug output... [ OK ]
Checking NVS filesystem... [ OK ]
Mounting NVS filesystem... [ OK ]
Initializing random number generator... [ OK ]
Starting base/hwrandom... [ OK ]
Starting base/dbus... [ OK ]
Starting base/linux... [ OK ]
Starting base/syslog... [ OK ]
Starting base/loopback... [ OK ]
Starting base/poe_done... [ OK ]
Starting base/portmapper... [ OK ]
Received event syslog.done
Starting base/modules... [ OK ]
Содержание AT-220-28GS Series
Страница 8: ...vi ...
Страница 10: ...viii ...
Страница 26: ...Chapter 1 Overview 16 ...
Страница 52: ...Chapter 2 Installation 42 ...