71
Chapter 3
Installing the Hardware
This chapter provides procedures to install a x610 switch. The chapter
contains the following sections:
“Reviewing Safety Precautions” on page 72
“Unpacking a Switch” on page 75
“Installing the Power Cord Retaining Clip” on page 76
“Installing the Switches in an Equipment Rack” on page 77
“VCStack Stacking Module Installation” on page 79
Содержание 48Ts/X
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 48: ...Chapter 1 Overview 48 Figure 23 AT PWR1200 Power Supply 2187 AT PWR1200 100 240VAC 16A MAX DC OUT FAULT...
Страница 88: ...Chapter 3 Installing the Hardware 88...
Страница 120: ...Appendix A Technical Specifications 120...