44
70269301
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the tumbler before servicing.
• Close gas shut-off valve to gas tumbler before servicing.
• Close steam valve to steam tumbler before servicing.
• Never start the tumbler with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the tumbler is properly grounded.
W002
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
50. FRONT PANEL
a. Remove control panel.
b. Unlock, open and remove lint panel. Set aside
to prevent damage.
c. Remove loading door assembly.
d. Support front panel and remove all screws
holding front panel to tumbler cabinet. Refer to
Figure 9.
e. Disconnect door switch harness.
Figure 9
SCREWS
SCREWS
SCREWS
TMB1553P
SCREWS
(4 Total)