
18
62631
Section 4 Grounding
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
19. METERED AND NONMETERED MODELS – FROM TERMINAL BLOCK BRACKET TO
ACCUMULATOR BRACKET OR TIMER (DEPENDING ON MODEL) AND FROM CABINET TOP
TO CONTROL PANEL
Refer to Figure 5
Figure 5
D098GE3C
GROUND
WIRES