1A
OPERATIONS
1.12 Steering
A slight "feathering motion" forward and backward with the left hand control lever is required to move the
machine in a straight path to the left or right while operating the right hand control lever. See illustration.
1
forward
2
reverse
3
rotate clockwise
4
rotate counter clockwise
5
left sideways
6
right sideways
1.13 Pitch Adjustment
Different pitch angles are needed as you work the dif-
ferent stages of the concrete. See the drawing below.
When changing or setting pitch (angle of trowel
blades), slow the machine down, set the desired
degree of pitch on the left side of the machine and
then adjust the right side to match.
To increase the pitch, turn the pitch control clockwise
(a) use the pitch indicator (b) to adjust pitch equally on
both right and left trowel blades.
1A-12
Содержание 900 NOL SFC 20HO
Страница 1: ...Version 2 ...
Страница 23: ...2A PARTS ENGINE MOUNT SYSTEM 2A 4 ...
Страница 27: ...2A PARTS STANDARD FAN COOLED SFC GEARBOX RIGHT HAND SITTING ON MACHINE SOM PART 034196 2A 8 ...
Страница 29: ...2A PARTS SFC GEARBOX LEFT HAND SOM PART 034197 2A 10 ...
Страница 31: ...2A PARTS 2A 12 STANDARD STD GEARBOX RIGHT HAND SITTING ON MACHINE SOM PART 026443 ...
Страница 33: ...2A PARTS STANDARD STD GEARBOX LEFT HAND SITTING ON MACHINE SOM PART 026442 2A 14 ...
Страница 35: ...2A PARTS FUEL SYSTEM ASSEMBLY 2A 16 TANK SHOWN FOR REFERENCE ONLY THE 900 EDGER TANK IS DIFFERENT ...
Страница 37: ...2A PARTS 2A 18 ELECTRICAL COMPONENTS ...
Страница 39: ...2A PARTS 2A 20 WIRING HARNESS ...
Страница 41: ...2A PARTS 2A 22 PITCH CONTROL ASSEMBLY ...
Страница 43: ...2A PARTS STEERING LEVER ASSEMBLY 2A 24 ...
Страница 45: ...2A PARTS SPRAY SYSTEM ASSEMBLY 2A 26 ...
Страница 47: ...2A 28 2A PARTS SPIDER ASSEMBLY ...