background image

PACKAGE CONTENTS

INSTALLATION OVERVIEW

HARDWARE CONTENTS

INSTALLATION OVERVIEW

Note: 

Hardware not shown actual size.

 

 

QUICK REFERENCE GUIDE

QUICK REFERENCE GUIDE

INSTALLATION OVERVIEW

2

1

3

Once all connections are made, tighten BB with CC.

 

4

6

7

Once all connections are made, tighten AA with DD. 

 

x 12

Place E, F and I onto G. 

AA

AA 

QUICK REFERENCE GUIDE

AA 

BB 

     M6*15

    M6*25

x 12

BB

CC 

x 8

BB 

AA 

Once all connections are made, tighten AA, BB with CC.

G

G

Once all connections are made, tighten CC with EE.

4

5

6

8

     M8*40

x 1

EE

x 1

DD

x 3

x 2

x 3

x 2

x 1

x 1

x 2

x 4

x 1

x 4

x 4

Place E and F onto C. 

Once all connections are made, tighten AA with hand. 

BB 

AA 

AA 

BB 

CC 

CC 

BB 

Отзывы: