Rockwell Automation Publication 750-UM006C-EN-P - March 2022
169
Drive Maintenance
Chapter 5
Attach the Front Cover
1. Verify that all terminals, connections, and wires are secure.
2. Verify that proper torque values were used.
3. Verify that the Ethernet cable is attached to the Frame 2 drive and the
ETAP.
4. Attach the HIM cable to the Frame 2 receptacle.
5. Attach the front covers to the Frame 2. See
for more information on attaching the
Frame 2 covers.
6. To align the drive cover, align the main circuit breaker shaft with the
rotary disconnect switch, and allow them to fully mate.
7. Rotate the cover counter-clockwise to expose the grounding stud.
8. Use a 10 mm wrench to attach the nut and washer that secure the
ground wire to the ground stud.
9. Verify that the HIM cable, ground wire, and Ethernet cable are properly
stored.
10. Rotate cover clockwise to align the cover and enclosure holes.
11. Insert the 12
M12 x 20 mm
screws and washers. Use the
T30 torque bit
to tighten the screws.
Torque the screws to
25 lb•in
12. Reattach connector cables to the gland plate and torque them hand-
tight.
13. Follow instructions to
Содержание The PowerFlex 755 On-Machine
Страница 1: ...User Manual Original Instructions PowerFlex 755 On Machine Drive Bulletin Number 26G...
Страница 208: ...208 Rockwell Automation Publication 750 UM006C EN P March 2022 Appendix B Startup Information Notes...
Страница 216: ...216 Rockwell Automation Publication 750 UM006C EN P March 2022 Index Notes...
Страница 217: ...Rockwell Automation Publication 750 UM006C EN P March 2022 217 PowerFlex 755 On Machine Drive User Manual...