Rockwell Automation Publication 1560F-UM001A-EN-P - June 2019
71
Commissioning Procedure
Chapter 3
• Verify that circuit board plug connectors are installed and fully inserted in
their sockets.
• Verify that the cooling fan (if supplied) is secured and the rotor is not
obstructed.
• Complete device resistance checks per user manual (refer to
Checks on page 80 of Chapter 3
• Complete Power Supply Tests (refer to
Power Supply Tests on page 77 of
• Program the module with correct parameter settings.
• Start the unit and record scope waveforms (line voltage, motor voltage and
motor current).
Preliminary Check
A. Verify correct power cable phase sequencing, and that connections are
tight.
B. Verify power fuse ratings and condition.
C. Verify control fuse ratings and condition.
D. Check that power cable installation has not damaged components, and
that electrical spacings have not been reduced.
E. Check that fiber-optic cables are fully seated in their connectors.
F. Check that circuit board plug connectors are installed and fully inserted in
their sockets.
G. Check that the cooling fan (if supplied) is secured and the rotor is not
obstructed.
H. Verify integrity and operation of all interlocks.
I. In the case of the 1503E, verify wiring and perform all tests in conjunction
with OEM documentation.
ATTENTION:
Ensure that all sources of power are isolated and locked out before
working on installed equipment. Verify that all circuits are voltage free using a
hot stick or appropriate voltage measuring device. Failure to do so may result in
severe burns, injury or death.
Содержание SMC-50
Страница 10: ...10 Rockwell Automation Publication 1560F UM001A EN P June 2019 Table of Contents Notes ...
Страница 12: ...12 Rockwell Automation Publication 1560F UM001A EN P June 2019 Preface Notes ...
Страница 68: ...68 Rockwell Automation Publication 1560F UM001A EN P June 2019 Chapter 2 Installation Notes ...
Страница 120: ...120 Rockwell Automation Publication 1560F UM001A EN P June 2019 Chapter 4 Programming Notes ...
Страница 130: ...130 Rockwell Automation Publication 1560F UM001A EN P June 2019 Chapter 5 Metering Notes ...
Страница 134: ...134 Rockwell Automation Publication 1560F UM001A EN P June 2019 Chapter 6 Optional HIM Operation Notes ...
Страница 144: ...144 Rockwell Automation Publication 1560F UM001A EN P June 2019 Chapter 7 Communications Notes ...
Страница 156: ...156 Rockwell Automation Publication 1560F UM001A EN P June 2019 Chapter 8 Diagnostics Notes ...
Страница 198: ...198 Rockwell Automation Publication 1560F UM001A EN P June 2019 Chapter 10 Maintenance Notes ...
Страница 240: ...240 Rockwell Automation Publication 1560F UM001A EN P June 2019 Appendix A Parameter Information Notes ...
Страница 242: ...242 Rockwell Automation Publication 1560F UM001A EN P June 2019 Appendix B Controller Duty Cycle Ratings Notes ...
Страница 250: ...250 Rockwell Automation Publication 1560F UM001A EN P June 2019 Appendix C 1560F and 1562F Relay Control Notes ...
Страница 280: ...280 Rockwell Automation Publication 1560F UM001A EN P June 2019 Appendix G Using DeviceLogix Notes ...
Страница 284: ...284 Rockwell Automation Publication 1560F UM001A EN P June 2019 Appendix H Spare Parts Notes ...
Страница 286: ...286 Rockwell Automation Publication 1560F UM001A EN P June 2019 Appendix I Accessories Notes ...
Страница 291: ......