4
Rockwell Automation Publication 1732IL-IN001B-EN-P - April 2019
ArmorBlock 16-Channel IO-Link Hubs
About the IO-Link Hub
ArmorBlock 16-Channel IO-Link Hubs
Before You Begin
Before you install the IO-Link hub, verify that you have the following:
Install the Hub
To install the hub:
• Mount the hub
• Connect the I/O, IO-Link, and power cables to the hub.
Components Needed to Install an IO-Link Hub
Component
Description
Tools
You need the following tools:
• Screwdriver
(1)
Functional earth is provided for the grounding of field devices and is internally connected to each Pin 5 of the M12 style A-coded I/O connectors.
M12 style A-coded
I/O connectors
M12 style
A-coded
I/O connectors
M12 style
L-coded
aux power
connector
M12 style A-coded IO-Link connector
1732IL-IB16M12
1732IL-16CFGM12M12L
Functional earth
(1)
M12 style
A-coded
IO-Link connector
1732IL-10X6M12
M12 style
A-coded
I/O connectors