Rockwell Automation Publication 23PFC-TG001A-EN-P - March 2018
107
Frame B Field Controller Part Replacement Procedures
Chapter 4
13. Remove the two screws and washers that secure each SCR module to the
heat sink and remove the SCR module.
Install the SCR Modules
Install the SCR modules in reverse order of removal.
• Use the following orientation for installing the SCR modules:
IMPORTANT
Thermal grease must be applied to the bottom of each SCR module before
securing it to the heat sink.
13
1
2
3
2
1
3
Gate Leads at Top
Gate Leads at Bottom
Содержание 23PFC
Страница 8: ...8 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Preface Notes ...
Страница 130: ...130 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix A Schematics Notes ...
Страница 142: ...142 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix B Circuit Board Layouts and Connections Notes ...
Страница 148: ...148 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Index Notes ...
Страница 149: ......