124
Rockwell Automation Publication 20Y-TG001C-EN-P - April 2017
Appendix D
Disassembly/Assembly Diagrams and Spare Parts
Precharge Assembly
Figure 44 - Precharge Assembly for AFE in IP20 2500 MCC Style Enclosure
Table 19 - Precharge Assembly Part Numbers for AFE in IP20 2500 MCC Style Enclosure
Front View
(shown with enclosure doors removed)
Precharge
Resistors
• Precharge Fuse and Fuse Holder
• Precharge Kit
• Control Transformer (T4)
• Control Transformer Primary
Fuse and Fuse Holder
Control Transformer (T10)
Secondary Fuse and Fuse
Holder
Control Box
(on front of enclosure door; shown with control
box cover removed)
Part Name
Cat. No.
Precharge fuse
SK-Y1-MCCF5-F10
Precharge fuse holder
SK-Y1-MCCF5FUSEHOLDER-F10
Precharge kit
(1)
(1) Kit includes diode bridge (V6), two resistors (R6.1 and R6.2), and a snubber capacitor (C1).
SK-Y1-PRE2-F10
Control transformer (T4), 1500VA
SK-R1-OFANXFMR
Control transformer
primary fuse
400/480V
SK-Y1-MCCF6-D
600/690V
SK-Y1-MCCF6-F
Control transformer primary fuse holder
SK-Y1-MCCF6FUSEHOLDER
Control transformer (T10) secondary fuse/holder
SK-Y1-MCCF3F4
Содержание 20Y
Страница 10: ...10 Rockwell Automation Publication 20Y TG001C EN P April 2017 Preface Notes...
Страница 18: ...18 Rockwell Automation Publication 20Y TG001C EN P April 2017 Chapter 1 Troubleshooting and Error Codes Notes...
Страница 26: ...26 Rockwell Automation Publication 20Y TG001C EN P April 2017 Chapter 2 Active Front End System Overview Notes...
Страница 82: ...82 Rockwell Automation Publication 20Y TG001C EN P April 2017 Chapter 7 LCL Filter Component Section Notes...
Страница 86: ...86 Rockwell Automation Publication 20Y TG001C EN P April 2017 Chapter 8 DC Fuses Component Section Notes...
Страница 90: ...90 Rockwell Automation Publication 20Y TG001C EN P April 2017 Appendix A Service Tools and Equipment Notes...
Страница 112: ...112 Rockwell Automation Publication 20Y TG001C EN P April 2017 Appendix B Schematic Diagrams Notes...
Страница 133: ......