Rockwell Automation Publication 2080-UM005E-EN-E - March 2018
29
About Your Controller
Chapter
2
Schematic (Using ANSI/CSA Symbols)
Emergency-Stop
Push Button
230V AC
Operation of either of these contacts will
remove power from the external I/O
circuits, stopping machine motion.
Fuse
MCR
Fuse
MCR
MCR
MCR
Stop
Start
Line Terminals: Connect to terminals of Power
Supply
Line Terminals: Connect to 24V DC terminals of
Power Supply
230V AC
Output
Circuits
Disconnect
Isolation
Transformer
115V AC or
230V AC
I/O Circuits
L1
L2
Master Control Relay (MCR)
Cat. No. 700-PK400A1
Suppressor
Cat. No. 700-N24
(Lo)
(Hi)
DC Power Supply. Use
NEC Class 2 for UL
Listing
.
X1
X2
115V AC or
230V AC
_
+
MCR
24 V DC
I/O
Circuits
Suppr.
Overtravel
Limit Switch
44565
Содержание 2080-LC20-20AWB
Страница 6: ...vi Rockwell Automation Publication 2080 UM005E EN E March 2018 Preface Notes...
Страница 10: ...x Rockwell Automation Publication 2080 UM005E EN E March 2018 Table of Contents Notes...
Страница 16: ...6 Rockwell Automation Publication 2080 UM005E EN E March 2018 Chapter 1 Hardware Overview Notes...
Страница 40: ...30 Rockwell Automation Publication 2080 UM005E EN E March 2018 Chapter 2 About Your Controller Notes...
Страница 46: ...36 Rockwell Automation Publication 2080 UM005E EN E March 2018 Chapter 3 Install Your Controller Notes...
Страница 66: ...56 Rockwell Automation Publication 2080 UM005E EN E March 2018 Chapter 4 Wire Your Controller Notes...
Страница 106: ...96 Rockwell Automation Publication 2080 UM005E EN E March 2018 Chapter 8 Using the Micro800 Remote LCD Notes...
Страница 162: ...152 Rockwell Automation Publication 2080 UM005E EN E March 2018 Appendix B Troubleshooting Notes...
Страница 173: ...Rockwell Automation Publication 2080 UM005E EN E March 2018 163 Quickstarts Appendix C...
Страница 210: ...Rockwell Automation Publication 2080 UM005E EN E March 2018 200 Index Notes...
Страница 211: ...Rockwell Automation Publication 2080 UM005E EN E March 2018 201...