Assembly data
Production Line
Xone
Product
PX5
Assembly Stage
Final assembly
Issue Date
12/07/16
Revision Number
ISSUE 1
AH-M0773
45.
LOWER THE FRONT PANEL DOWN ONTO THE BASE.
46.
ENSURE ALL x4 CORNERS ARE LOCATED INSIDE THE RAISED EDGES OF THE BASE. YOU
MAY NEED TO LOOSEN THE SCREWS ON THE SIDES TO LOCATE CORNERS.
REMEMBER
TO TIGHTEN ALL SCREWS AGAIN.
47.
SECURE THE FRONT PANEL USING AB9037 SCREW M3X5 TRUNC CSK x8.