background image

ALLEN & HEATH

Section C - 3

L2dSM2

SPECIFICATION

AC MAINS INPUT:

100V, 110V, 120V, 220V, 230V or 240V @ 50Hz to 60Hz single phase

POWER CONSUMPTION:

60VA

DC OUTPUT:

+48V @ 100mA, +/- 16V @ 0.8A per rail. (GL2000-424)

NOISE & RIPPLE:

< 2mV max (peak to peak)

SERVICE ACCESS

Any fault condition, with the exception of simple mains fuse failure due to underrating or an unusual mains input
condition, will require removal of the base cover to enable correction of the fault.  This is achieved using a cross-head
screwdriver to remove all of the base screws which are positioned along the edges of the base. Do not forget to remove
the two screws in the centre rear of the base.

Carefully lift the cover and place it to one side. The power supply sub chassis can then be removed by unsrewing the
2 mounting screws (A) in the console rear panel and the 2 fixing screws (B) in the sub chassis base next to the PSU
circuit board. Take care not stretch the wires connected to the console.

Servicing Components

All of the regulators are  in TO220 packages. To replace them, it will be necessary to remove the power supply circuit
board assembly with the heatsink attached. Refer to the L2D PSU assembly diagram 002-150.

1.) Remove the 4 PCB mounting nuts (C) and 2 heatsink fixings (D).

2.) Carefully lift the heatsink and PCB assembly clear of the PSU sub chassis and unscrew the screw and nut

of the regulator IC that requires replacing. Take care to retain the small insulating bush beneath the head
of the screw and the insulating SIL pad under the regulator.

3.) Rotate the assembly to gain access to the solder side of the PCB and desolder the three terminals attached

to the regulator. The regulator can now be removed.

4.) Fit the replacement regulator by first fixing it to the heatsink using the screw and nut and then soldering the

three terminals to the circuit board. Make sure the insulating SIL pad and bush are fitted. The metal tab at
the top of the package is electrically connected to the centre lead and correct insulation is essential.  If the
insulating SIL pad between the regulator and the heatsink looks damaged then it should be replaced before
installing the new regulator.  Note that the regulators rely on good thermal contact with the heatsink to
dissipate heat, and this is provided by the SIL pad.

5.) Reassemble the circuit board and heatsink assembly into the power supply sub chassis. Check your work

and remove any debris from the sub chassis before refitting it to the console.

CAREFULLY CHECK ALL WIRING CONNECTIONS AND ENSURE THAT THERE ARE NO LOOSE
PARTS LYING AROUND INSIDE THE CONSOLE.

console inverted with the base removed

A

A

B

C

C

D

B

D

Содержание GL 2000

Страница 1: ... Unit PSU work should only be carried out by qualified personnel We recommend that you use an approved Allen Heath service centre for all power supply work Please contact your local Allen Heath distributor for more details http www allen heath com ...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ...INTERNAL COMPONENTS BY MISHANDLING AND OR MISCONNECTION ONLY TECHNICALLY COMPETENT PERSONNEL SHOULD ATTEMPT SERVICE WORK ON THIS UNIT ANYSERVICEWORK SHOULDBEUNDERTAKENONLYAFTERDISCONNECTING THE MAINS SUPPLY LEAD FROM THE POWER SUPPLY UNIT POWER SUPPLY SECTION C ...

Страница 18: ... any special cooling arrangement but should not be covered in any way Always stand the unit on a firm flat surface well away from any soft furnishings THE POWER SUPPLY AND CONSOLE EARTHING The GL2000 power supply is a linear power supply which like other linear supplies produces DC voltages by rectifying smoothing and regulating AC voltages from the secondary windings of a mains transformer The co...

Страница 19: ...nd 2 heatsink fixings D 2 Carefully lift the heatsink and PCB assembly clear of the PSU sub chassis and unscrew the screw and nut of the regulator IC that requires replacing Take care to retain the small insulating bush beneath the head of the screw and the insulating SIL pad under the regulator 3 Rotate the assembly to gain access to the solder side of the PCB and desolder the three terminals att...

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Отзывы: