background image

 

 

 

 

                                                 Operation 

 

Algas-SDI Operation and Maintenance Manual - VH100-VH200 

3-4  

 

 

 

Manual Startup Guide 

 

 

Startup combustion air supply.  

 

Open gas shut-off valve and start ignition sequence.  

 

Visually check for flame to confirm that burner has lit.  

 

DANGER: 

If no flame can be seen, close the gas valve to stop gas 

flow. Allow flame safety to purge the body of gas before attempting to 

restart the burner.  

 

 

Manual Shutdown Guide 

 

 

Close the gas shut-off valve at the burner. 

 

Allow the air supply to run until the temperature of the 

chamber is less than 1000 °F.  

 

Shut off combustion air supply.  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание PHOENIX VH100

Страница 1: ...nce Manual 151 South Michigan Street Seattle Washington USA 98108 Tel 206 789 5410 Fax 206 789 5414 Web www algas sdi com This manual covers units built after April 2022 After S N 3220019135 FILE MANU...

Страница 2: ...and a thorough understanding of the equipment is required to allow safe operation and maintenance Allow only a TRAINED and FULLY QUALIFIED PERSON to service this equipment Any time a component must b...

Страница 3: ...s a potential hazard which can result in severe personal injury or death Use extreme care and follow the instructions given ELECTRICAL DISCONNECT REQUIRED Indicates a potentially dangerous situation w...

Страница 4: ...URNER INSTALLATION 7 ALLOY COMBUSTOR 8 CHECKLIST AFTER INSTALLATION 9 PREPARE FOR START UP ADJUSTMENT 9 3 OPERATION 1 INITIAL SETUP 1 FIXED AIR SYSTEMS AIR FLOW 2 FIXED AIR SYSTEMS GAS FLOW 2 ON RATIO...

Страница 5: ...bustion air to supply a focused high temperature flame with flexibility of fuel options The Phoenix VH burners are available in three models all with high velocity and medium velocity combustor option...

Страница 6: ...1 2 Burner Body Burner Nozzle Burner Rear Cover Combustor Fuel Inlet Block Air Inlet Block Igniter Flame Supervision O rings Orifice Plates Utilizing a nozzle mix design fuel enters through the cente...

Страница 7: ...the burner in the original package if possible Checklist Before Installation Intake To admit fresh combustion air from outdoors provide an opening in the room of at least one square inch per 4 000 BT...

Страница 8: ...the burner Check the following items Type and supply pressure of the fuel Availability of enough fresh clean combustion air Humidity altitude and temperature of air Absence of damaging corrosive fumes...

Страница 9: ...Remove the four bolts on fuel inlet 1 Remove the inlet block O rings and Orifice Plate from the rear cover 1 NOTE Be careful not to lose or damage the orifice plate or the O rings Remove the four bol...

Страница 10: ...lt ignition transformer must be used to supply power to igniter If equipment other than those that are recommended are used performance may vary from Algas SDI published values Install the flame super...

Страница 11: ...rner to support the weight of the burner Refractory furnace walls must allow for thermal expansion as recommended by the refractory supplier the wall should apply no stress on the combustor or refract...

Страница 12: ...supplied with the burner is installed between the burner and the chamber wall Verify the gasket does not leak Check the size of the clearance between the furnace wall and combustor If the gap around...

Страница 13: ...electrician rewire the blower to reverse its rotation Verify all valves are installed in the proper location and correctly orientated relative to the gas or air flow direction Prepare for Start Up Adj...

Страница 14: ...line to the air differential pressure between taps A and B to the stated pressure for high fire in the Phoenix VH specification sheet Ignite burner per instructions on the following pages for gas flo...

Страница 15: ...ion Sheet Remove manometer and close pressure taps A and B Fixed Air Systems Gas Flow Turn gas valves down to low fire position Start the ignition sequence Visually check for flame to confirm that bur...

Страница 16: ...h fire position Confirm air differential pressure is still at the set point and adjust accordingly Use a small flat head screwdriver to open pressure taps C and D Attach manometer to taps C and D Adju...

Страница 17: ...check for flame to confirm that burner has lit DANGER If no flame can be seen close the gas valve to stop gas flow Allow flame safety to purge the body of gas before attempting to restart the burner...

Страница 18: ...ition Do not operate any equipment that may create a spark during maintenance WARNING High voltage ignition transformer can cause severe injury or death when handled incorrectly Do not perform mainten...

Страница 19: ...proper gap Check valve motors and control valves for free smooth action and adjustment Check for proper operation of ventilating equipment Test the interlock sequence of all safety equipment manually...

Страница 20: ...oes not open Check solenoid valve coil for proper orientation Replace if needed Not enough gas The gas pressure out of the main gas pressure regulator is too low Check start up setting Check regulator...

Страница 21: ...ntrols and valves The burner is unstable or produce soot and or smoke The air gas ratio is incorrect Measure all gas pressures and air pressures Compare to initial start up settings and adjust as nece...

Страница 22: ...Troubleshooting Algas SDI Operation and Maintenance Manual VH100 VH200 5 3 Spare Parts List Models VH100 VH200...

Страница 23: ...h Velocity 1 N A 7001 4004 N A 10 Combustor Alloy Medium Velocity 1 N A 7001 4003 N A 10 Combustor Alloy High Velocity 1 7001 4002 N A N A 10 Combustor Alloy Medium Velocity 1 7001 4001 N A N A 30 Noz...

Страница 24: ...Algas SDI International LLC 151 South Michigan Street Seattle Washington 98108 Ph 1 206 789 5410 Fax 1 206 789 5414 www algas sdi com...

Отзывы: