Содержание ALF-PZA-BIA

Страница 1: ......

Страница 2: ...raight up Do not remove the top radiant stone it s designed to stay there See Figure 1 Install the BIA Kit Hood by laying it on top and sliding forward until all the screw holes located in it s sides and back line up correctly with the holes in the body of the ALF PZA See Figure 2 Fasten all 9 self tapping screws to permanently fix the BIA Hood to the body of the ALF PZA Unit Once the BIA Hood is ...

Страница 3: ...ng the pizza oven into a non combustible structure it is critical to have access to the bottom of the unit This will be the only means of service and maintenance as the oven will no longer be removable Alfresco recommends installing an AB 30 double sided door for service storage gas supply and electrical power access The Pizza Oven must rest on two 2 ledges to give it proper sup port and must have...

Страница 4: ...ofing is strongly recommended on the top section of the built in enclosure as to have a complete weather tight assembly around all areas including but not limited to the vent flue design See Figure 7 It is highly recommended to install access doors below the ALF PZA unit when designing the built in construction such as Alfresco s AB Doors The access is required for piping LP or NG shut off valves ...

Страница 5: ...nd the back panel Re installing the appropriate size compression fitting for a flexible hose connections or Hard piping the oven with 1 2 NPT piping When designing a built in enclosure with gas supplies connected from the bottom of the unit a shut off valve with unrestricted access is required Always shut off the gas supply when the unit is not in use to ensure safety For additional ALF PZA BIA pr...

Страница 6: ...6 ...