background image

 

 

DO NOT approach and touch the door of the combustion chamber while the boiler is operating. There is a RISK OF 
BURN INJURIES. 

 

DO NOT approach or touch the flue pipe, while the boiler is operating. There is a RISK OF BURN INJURIES. 

 

During operation, DO NOT clean the heating installation. 

 

DO NOT open the firebox door while the boiler is operating, as it works properly only if the door is sealed. 

 

DO NOT remove ash when the boiler is operating. 

 

DO NOT allow children and animals to approach the pellet boiler . 

 

ADHERE TO THE INSTRUCTIONS STATED IN THIS DOCUMENT 

Follow the below tips for correct use of the boiler : 

 

Only use fuel recommended by the boiler manufacturer. 

 

Observe the maintenance instructions. 

 

Clean the firebox after consuming 100 to 200 kg of pellets (every 3 to 4 days, only when the boiler and ash in it are 
cool).  

 

DO NOT use the pellet boiler if there are any breakdowns or other irregularities, unusual sounds, and /or if you suspect 
there is a breakdown. Contact your authorized maintenance centre IMMEDIATELY. 

 

DO NOT pour water on the boiler with or use water to extinguish fire in the combustion chamber. 

 

DO NOT lean on the boiler because it may not be stable enough and can overturn. 

 

DO NOT use the pellet boiler as a support or as a means of supporting other objects. Do not leave the pellet tank open. 

 

DO NOT touch the painted parts of the boiler during operation. 

 

DO NOT use wood or coal in the pellet boiler ; use only pellets of the following characteristics:  

dimensions: diameter 6 mm  
maximum length: 30 mm  
moisture: up to 10%  
heating value: min. 16.9 MJ / kg, or 4.7 kWh / kg  
ash content: below 0.7%  

 

DO NOT use the boiler for burning garbage. 

 

Always take care of maximum safety. 

 

 

GUIDELINES FOR SAFE IGNITING AND CLEANING THE BOILER  

 
NEVER use fuel oil, petroleum or similar products, or other flammable liquids to start fire in the boiler . While the boiler is in 

operation keep such and other liquids away from it. 

Make sure the pellet boiler is properly positioned and that it does not move. 
Make sure the firebox is well closed and remain closed during operation of the pellet boiler . 
Remove ash only while the pellet boiler is cold. 

Do not use abrasive cleaning agents for cleaning the pellet boiler . 
 

 

ROUTINE MAINTENANCE AND CLEANING THE  BOILER  

Using vacuum cleaner ash facilitates removing the ash from the boiler . 

Before proceeding with any maintenance or cleaning procedures, observe the following safety rules: 

 

Turn off the pellet boiler before starting any procedure. 

 

Before starting any boiler maintenance activity, make sure the ash is cold. 

 

Use protective gloves for cleaning. 

 

You need to know what the better and cleaner the pellet, the less frequently you need to clean and maintain the boiler . 

 

 

CLEANING THE FIREBOX  

 

Clean the firebox every 3-4 days. 

 

Open the upper exterior door of the boiler (Figure 10a). 

 

Open the combustion chamber door (Figure10b). 

 

Lift the firebox handle using the enclosed wrench (Fig. 10c), then lift the firebox and remove the firebox from its casing 
(Figure 10d).  

 

Turn the firebox and pour the ash and slag into the garbage bin. Then brush the sides and the bottom of the support 
with a brush and sharp object so that all openings on the firebox are clean. 

 

Finally, use a vacuum cleaner to clean the inside of the firebox (Fig. 10e). 

           

 

      

   

 

 

  

  

        

Figure 10a 

 

 

 

Figure 10b   

 

 

 

Figure 10c   

Содержание COMMO COMPACT 32

Страница 1: ...COMPACT 32 Installation Operation and Maintenance Manual This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level in order to contribute to the re...

Страница 2: ...ACCUMULATING BOILER ETC 18 LITRE EXPANSION TANK ENOUGH FOR 37 5 KW HEATING POWER AUTOMATIC AIR VENT VALVE SET ON THE HOT WATER OUTLET FROM THE BOILER SAFETY VALVE INSTALLED ON THE HOT WATER OUTLET FRO...

Страница 3: ...IONAL MAINTENANCE 10 CHARACTERISTIC BUILT IN ELEMENTS 11 CIRCULATION PUMP 11 EXPANSION TANK 11 FILL AND DRAIN COCK 11 ELECTRONIC SYSTEM 11 NON RETURN VALVE AUTOMATIC AIR VENT VALVE SAFETY VALVE AND WA...

Страница 4: ...Pellet boiler hydraulic installation diagram radiator and floor heating 27 Pellet boiler hydraulic installation diagram accumulation tank 28...

Страница 5: ...approach the boiler while in operation with the intention of playing This appliance can be used by children aged 8 and older and persons with reduced physical sensory or mental abilities if they are...

Страница 6: ...this document The installer is to check whether the air supply pipes correspond to the type of the installed boiler The electrical connections must not be executed with the use of temporary and or uns...

Страница 7: ...east 100 cm2 or bigger The boiler operates at 220 230 V 50 Hz Ensure that the electrical cables do not go under the boiler that they are away from hot surfaces and that they cannot come in contact wit...

Страница 8: ...the qualified chimney sweep Flue gases can be discharged directly into the chimney only if it has a cap for the purposes of inspection and cleaning and if its cross section is up to 20 x 20 cm i e if...

Страница 9: ...for a longer distance In this case the length is up to 8m INSULATION AND DIAMETER OF THE OPENINGS ON THE ROOF Once the position of the boiler has been determined it is necessary to make a hole i e an...

Страница 10: ...Grounding is prescribed by the law Under no circumstances may the electrical cable be exposed to a temperature above 80 C The power cable is part of the equipment that is supplied with the boiler It i...

Страница 11: ...uality and do not use any other types of fuel Inform all users on possible risks and hazards and show them how to handle the pellet boiler If the boiler is placed on a wooden floor it should be insula...

Страница 12: ...ing value min 16 9 MJ kg or 4 7 kWh kg ash content below 0 7 DO NOT use the boiler for burning garbage Always take care of maximum safety GUIDELINES FOR SAFE IGNITING AND CLEANING THE BOILER NEVER use...

Страница 13: ...l forward and by lowering it Figure 12b Take the upper ashtray out and pour the ashes into the garbage bin Then clean the ashtray and the space around the ashtray in the boiler with the vacuum cleaner...

Страница 14: ...er clarifications The manufacturer does not have direct supervision over the work of the installer and cannot guarantee for the performed works or maintenance works In no case does the manufacturer as...

Страница 15: ...e careful when connecting to a heating installation so that it does not rotate When the pump does not operate for a long period of time there is a risk that the pump shaft jams and cannot start at the...

Страница 16: ...to the valve you must take the right side off when facing the boiler Valve safety cap should be loose not too tight so that the air could freely leave 7 4 5 3 SAFETY VALVE The safety valve is with R1...

Страница 17: ...firemen In order to preserve safety and proper functioning of the pellet boiler do not use chopped wood Do not use the boiler for burning garbage THE PELLET QUALITY IS VERY IMPORTANT The pellet quali...

Страница 18: ...system BOILER CONTROL SYSTEM The boiler has an advanced control system that allows safe efficient and reliable operation control and maximum functional utilization of the boiler It is characterized b...

Страница 19: ...outlet has been activated L4 Additional motor Led light is on Additional motor has been activated L5 Aux 2 outlet Led light is on Aux 2 outlet has been activated L6 Aux 3 outlet Led light is on Aux 3...

Страница 20: ...ode Link Error This message informs you that there is no communication between the LCD display and the controller in the boiler Standby Man This message appears if the system is in Standby Mode after...

Страница 21: ...eters Chrono Menu for selecting modality of the Chrono Program and boiler turn on off time Manual Load Menu for manual loading of the auger It is only feasible when the system is in the OFF state Time...

Страница 22: ...50 U04 1380 U05 1610 U06 1840 U07 2070 U11 1030 Note The calibration of the auger and flue gas motor should not be carried out without prior consultation with the authorized maintenance staff or repre...

Страница 23: ...hrono Program By entering the Chrono Menu you see two submenus Modality and Programming Press the P4 and P6 keys to choose one of the submenus and then enter it by pressing the P3 key When you enter t...

Страница 24: ...pressing the P4 and P6 keys the hours minutes years months and days are set By pressing the P3 key you enter the change mode and by pressing the P4 and P6 keys you change the value If you press the P...

Страница 25: ...lighter Ignition Preload At this stage pellets are preloaded i e the auger loads a certain quantity of pellets that is necessary for ignition At this stage the lighter auger and flue gas motor are act...

Страница 26: ...The minimum duration of this phase is 300 seconds and the flue gas temperature needs to be less than 70 C in order to extinguish the furnace completely OFF In this phase the boiler is extinguished flu...

Страница 27: ...he furnace to extinguish and then press the P2 key for more than 3 seconds Check the condition and quality of the used pellet The appropriate flue gas temperature has not been reached during the Ignit...

Страница 28: ...an also be entrusted to a third person who is licensed for such activities INDICATION In any case you must comply with the laws of the country in which the pellet boiler is installed WARNING All disas...

Страница 29: ...r mg m3 26 2 Flue gas mass at nominal power kg s 0 0175 Flue gas mass at reduced power kg s 0 0072 Maximum operating water pressure bar 2 Maximum operating water temperature C 80 Boiler capacity l 68...

Страница 30: ...COMMO CONTACT 32 BOILER HYDRAULIC INSTALLATIONS DIAGRAM OF COMMO CONTACT 32 PELLET BOILER In order to reduce the risk of condensation install a three way mixing valve with a pipe thermostat when insta...

Страница 31: ...ydraulic installation diagram radiator and floor heating Legenda 1 Pellet boiler 2 Three way mixing valve with pipe thermostat Legenda 1 Pellet boiler 2 Hydraulic separator 3 Circulation pump 4 Three...

Страница 32: ...aulic installation diagram accumulation tank Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Air vent 5 Circulation pump 6 Three way mixing valve with pipe thermostat 7 Accumulation tank BUFF...

Отзывы: