4.2 Requirements
4
1
3
2
Space
Please refer to the delivered PHE drawing for actual measurements.
1.
Free space is required for lifting plates in and out.
2.
Free space is required under the lower tightening/locking bolt for
maintenance.
3.
Supports for the guiding bar may be needed.
4.
Do not use fixed pipes or other fixed parts like feet, fasteners etc. inside
the shaded area.
Foundation
Install on a flat foundation giving enough support to the frame.
Elbow
To make it easier to disconnect the heat exchanger, an elbow should be fitted
to the connection in the pressure plate, directed upwards or sideways, and
with another flange located just outside the contour of the heat exchanger.
Shut-off valve
To be able to open the heat exchanger, shut-off valves should be provided in
all connections.
Connection
Avoid excessive force on pipe connections.
200000423-1-EN-GB
20
4 Installation
EN
Содержание M line TS6
Страница 6: ...7 Storage of the heat exchanger 45 7 1 Storage in packing box 45 7 2 Taken out of service 46 ...
Страница 10: ...200000423 1 EN GB 10 2 Safety EN Safety ...
Страница 18: ...200000423 1 EN GB 18 3 Description EN ...
Страница 28: ...200000423 1 EN GB 28 5 Operation EN ...
Страница 44: ...200000423 1 EN GB 44 6 Maintenance EN ...