background image

First published: XXXX-XX

ESE03473-EN1

2016-12

Original manual

Instruction Manual

Alfa Laval GJ Tote Blast Station

Содержание GJ Tote Blast Station

Страница 1: ...First published XXXX XX ESE03473 EN1 2016 12 Original manual Instruction Manual Alfa Laval GJ Tote Blast Station...

Страница 2: ......

Страница 3: ...Marking 6 4 Installation 7 4 1 Unpacking delivery 7 4 2 Tools and materials 7 4 3 System layout 8 4 4 Pump and control panel mounting 9 4 5 pump set up 10 4 6 Pump priming 11 4 7 Electrical set up 11...

Страница 4: ...onformity with the following directive with amendments Machinery Directive 2006 42 EC DS EN ISO 12100 2011 The Pressure Directive 97 23 EC According to its own volume and the rated pressure range the...

Страница 5: ...ing the Alfa Laval GJ Tote Blast Station 2 1 Important information WARNING Indicates that special procedures must be followed to avoid serious personal injury CAUTION Indicates that special procedures...

Страница 6: ...ltistage centrifugal pump with motor control panel a x50 hose and all the necessary fittings and hardware required for permanent installation The system also comes with a threaded inlet adapter that c...

Страница 7: ...aise it upright and remove from the box In some cases eye bolts may be needed to move the pump The mechanical hoist must also be used to position the pump into place for mounting Remove the packaging...

Страница 8: ...e NOTE Use four 4 vibration resistant wedge stud anchors or equivalent to mount the vertical multistage pump For all electrical work including mounting positioning and wiring of all system components...

Страница 9: ...nting holes onto the floor Be sure to take into account the direction of the flow of the pump so that the suction hose and discharge hose can be properly routed Step 2 Move the pump out of the way to...

Страница 10: ...flow arrow located towards the bottom of the pump Then with the flange gasket in between the two flanges install the four flange bolts and nuts NOTE DO NOT TIGHTEN All four flange bolts must be snug f...

Страница 11: ...7 Electrical set up Alfa Laval recommends that all electrical work be done by a professional electrician using the proper industry standards The electrical diagram for the control panel can be found...

Страница 12: ...the timer on the control panel see appendix for timer instructions to the desired cleaning time and press the green button on the control panel to start If there is an emergency the operator can stop...

Страница 13: ...with internal timer Power rating See table Mains voltage 240 480 dual voltage On off Local mains disconnect Insulation class NEMA Timers Internal adjustable 1 min 1 hours PHYSICAL DATA Materials Prod...

Страница 14: ...o observe the technical data during installation operation and maintenance Inform personnel about the technical data 7 2 Pump curves at 60 Hz Flow rate Pump model Power rating 12 gpm CRI 3 19 3 HP 2 2...

Страница 15: ...tarting and while operating the Tote Blast Station 8 2 Service and Repair Upon every return of a product no matter if for modifications or repair it is necessary to contact your local Alfa Laval offic...

Страница 16: ...s the responsibility of the user of this document to comply with all applicable intellectual property laws Without limiting any rights related to this document no part of this document may be copied r...

Отзывы: