Alfa Laval FrontLine WideGap 100 Скачать руководство пользователя страница 5

Preface

Storage in packing box

If storage of the heat exchanger after delivery is known
in advance, inform Alfa Laval when ordering the heat
exchanger to ensure that it will be properly prepared for
storage before packing.

Indoor storage

Store inside a room with the temperature between
15 and 20°C (60–70°F) and humidity up to 70%. For
outdoor storage read “Outdoor storage” on this page.

To prevent damage to the gaskets, there should not be
any ozone-producing equipment in the room such as
electric motors or welding equipment.

To prevent damage to the gaskets, do not store organic
solvents or acids in the room and avoid direct sunlight,
intensive heat radiation or ultraviolet radiation.

The tightening bolts should be well covered with a thin
layer of grease. Refer to “Closing” on page 25.

Outdoor storage

If you need to store your heat exchanger outdoors, follow
all the precautions in the “Indoor storage” section as well as
the precautions listed below.

The stored heat exchanger shall be visually checked every
third month. When closing the packing it shall be restored
to original condition. The check includes:

Greasing of the tightening bolts

Metal port covers

Protection of the plate pack and gaskets

The packing

Taken out of service

If, for any reason, the heat exchanger is shut down and
taken out of service for a long period of time, follow the
precautions in the section ”Indoor storage” on this page.
However, before storage the following actions must be
done.

Check the measurement of the plate pack (measure
between frame plate and pressure plate, the

A

dimension).

Drain both media sides of the heat exchanger.

Depending on media, the heat exchanger should be
rinsed and then dried.

The connection should be covered if the piping system
is not connected. Use a plastic or plywood cover for
the connection.

Cover the plate pack with non-transparent plastic film.

Start-up after long-term out of service

If the heat exchanger has been taken out of service for an
extensive period of time, longer than one year, the risk of

leakage when starting up increases. To avoid this problem
it is recommended to let the gasket rubber rest to regain
most of its elasticity.

1. If the heat exchanger is not in position, follow the

instructions “Installation” on page 11.

2. Note the measurement between frame plate and

pressure plate (

A

dimension).

3. Remove the feet attached to the pressure plate.
4. Loosen the tightening bolts. Follow the instructions

“Opening” on page 20. Open the heat exchanger until
the measure

A

is 1.25.

5. Leave the heat exchanger for 24–48 hours, the longer

the better, for gaskets to relax.

6. Re-tighten according to the instructions “Closing” on

page 25.

7. Alfa Laval recommends a hydraulic test should be

carried out. The media, usually water, should be
entered at intervals to avoid sudden shocks to the heat
exchanger. It is recommended to test up to the Design
Pressure. Refer to the PHE drawing.

Environmental compliance

Alfa Laval endeavours to perform its own operations
as cleanly and efficiently as possible, and to take
environmental aspects into consideration when developing,
designing, manufacturing, servicing and marketing its
products.

Unpacking

Packing material consists of wood, plastics, cardboard
boxes and, in some cases, metal straps.

Wood and cardboard boxes can be reused, recycled or
used for energy recovery.

Plastics should be recycled or burnt at a licensed waste
incineration plant.

Metal straps should be sent for material recycling.

Maintenance

All metal parts should be sent for material recycling.

Oil and all non-metal wear parts must be taken care of
in accordance with local regulations.

Scrapping

At end of use, the equipment shall be recycled according
to relevant, local regulations. Besides the equipment itself,
any hazardous residues from the process liquid must be
considered and dealt with in a proper manner. When in
doubt, or in the absence of local regulations, please contact
the local Alfa Laval sales company.

Document ID

Language

Edition

3490017599

EN

2016-06

Instruction Manual - Plate Heat Exchangers

5

EN

Содержание FrontLine WideGap 100

Страница 1: ...Instruction Manual Plate Heat Exchangers M15 TL10 TL15 T20 TS20 MX25 MA30 WideGap 100 WideGap 200 3490017598 EN 2016 06 Original manual EN IT FI LT...

Страница 2: ......

Страница 3: ...continually updated on our website Please visit www alfalaval com to access the information directly Alfa Laval Corporate AB This document and its contents is owned by Alfa Laval Corporate AB and pro...

Страница 4: ...te NOTE indicates a potentially hazardous situation which if not avoided may result in property damage PHE drawings PHE plate heat exchanger drawings mentioned in the manual are the drawings included...

Страница 5: ...changer has been taken out of service for an extensive period of time longer than one year the risk of leakage when starting up increases To avoid this problem it is recommended to let the gasket rubb...

Страница 6: ...between frame plate and pressure plate Refer to the PHE drawing 4 Pressure plate Moveable plate that can contain a various number of portholes for the connection of the piping system 5 Guiding bar Kee...

Страница 7: ...ds of the tightening bolts Insulation For applications where the heat exchanger surface will be hot or cold insulation can be used Lifting device Separate device that are attached on the heat exchange...

Страница 8: ...3 Website for service 4 Drawing of possible locations of connections Location of 3A tag for 3A units 5 Space for mark of approval 6 Warning read manual 7 Date of pressure test 8 Maximum operating tem...

Страница 9: ...is assembled between a frame plate and a pressure plate and compressed by tightening bolts The plates are fitted with a gasket which seals the channel and directs the fluids into alternate channels T...

Страница 10: ...longer heating periods if the media requires slower heating 1 End plate I 2 End plate II 3 Channel plate 4 Transition plate 5 Turning plate 6 Partition plate 3 3 1 2 4 4 5 5 6 Figure 3 Example of a m...

Страница 11: ...ot or aggressive fluids and the hot plate pack If the heat exchanger surface temperature is expected to be hot or cold take protective actions such as insulate the heat exchanger to avoid risk for per...

Страница 12: ...ads from the piping system Connections in the pressure plate It is important that the plate pack has been tightened to the correct dimension A check against the PHE drawing before the piping system is...

Страница 13: ...and MA30 Raising This instruction is valid when raising the heat exchanger after delivery from Alfa Laval Only use a strap approved for the weight of the heat exchanger Follow the principle of the in...

Страница 14: ...ger on the timber beams Step 4 Place straps around one bolt on each side Step 5 Lift the heat exchanger off the timber beams Step 6 Lower the heat exchanger into a horizontal position and place it on...

Страница 15: ...started with valves closed and the valves must be operated as smoothly as possible Do not run pumps temporarily empty on the suction side Note Adjustments of flow rates should be made slowly in order...

Страница 16: ...pen the valve slowly Note Avoid rapid temperature changes in the heat exchanger With media temperatures over 100 C slowly increase the temperature preferably at least for one hour Step 7 When all the...

Страница 17: ...h one should be stopped first Step 1 Slowly close the valve controlling the flow rate of the pump you are about to stop Step 2 When the valve is closed stop the pump Step 3 Repeat Step 1 and Step 2 fo...

Страница 18: ...without opening it The purpose of cleaning with CIP is as follows Cleaning of fouling and descaling of lime deposits Passivation of cleaned surfaces to reduce susceptibility to corrosion Neutralizati...

Страница 19: ...the total diluted cleaning solution to provide better cleaning results on oily and fatty surfaces and where biological growth occurs AlfaAdd also reduces any foaming If CIP cannot be done cleaning mu...

Страница 20: ...Bolt configuration The bolt configuration of the heat exchanger varies between different models The major force of the plate pack is held by the tightening bolts TB To distribute the force evenly ove...

Страница 21: ...rom the pressure plate so that the pressure plate are free to move along the carrying bar Step 6 Inspect the sliding surfaces of the carrying bar and wipe clean and grease Step 7 Mark the plate assemb...

Страница 22: ...nating between each bolt until all reaction forces of the plate pack have disappeared Then remove the bolts A A 3 1 2 4 Step 11 Open the plate pack by letting the pressure plate glide on the carrying...

Страница 23: ...uipment such as safety boots safety gloves and eye protection when using the cleaning agents Warning Corrosive cleaning liquids Can cause serious injuries to skin and eyes Deposits removable with wate...

Страница 24: ...cleaning For a choice of cleaning agents refer to Cleaning liquids on page 19 Step 1 Brush with cleaning agent Step 2 Rinse immediately with water Note Long exposure to the cleaning agents can damage...

Страница 25: ...the grooves Note If the gasket is wrongly positioned it will show by the fact that it rises out of the gasket groove or that it is positioned outside the groove Step 4 If the plates have been removed...

Страница 26: ...e Nm kpm Nm kpm M30 900 90 M39 1300 130 2000 200 M48 2100 210 3300 330 For manual tightening the tightening torque has to be estimated If dimension A cannot be reached Check the number of plates and t...

Страница 27: ...s specified on the plate hanging list Use the marked line that was made when the heat exchanger was opened refer to Step 7 in Opening on page 20 Step 5 5 Press the plate pack together and put the tigh...

Страница 28: ...ther side open to the ambient pressure When multi pass set up all sections of the same side must be tested simultaneously Caution The pressure testing shall be performed at a pressure equal to the ope...

Страница 29: ...p 2 Remove the old gasket Step 3 Make sure that all sealing surfaces are dry clean and free of foreign matter such as fat grease or similar Step 4 Check the gasket and remove rubber residual before at...

Страница 30: ...Alfa Laval sales representative Refer to Warranty conditions on page 4 Step 2 Remove the old gasket Step 3 It is not necessary to remove old tape as the film is very thin Make sure however that the ga...

Отзывы: