background image

High-Pressure Grease Pump

SER 8550-A1

Alemite Corporation

3

Revision (

3-07

)

Item

No.

Part No.

Description

Qty

Notes

Numeric Order

Part #    (Item #)

1

331380-A5

Pump Assembly, High-Pressure

1

See SER 331380-A5

100

0

-66

(6)

2

328030

Coupler, Air, 1/4 " NPTF (f)

1

17804

(8)

3

328034

Connector, Air, 1/4 " NPTF (m)

1

43748

(4)

4

43748

Body, Angle, 1/4 " NPTF (m) and (f)

1

48018

(11)

5

315669

Adapter, 3/8 ’’ NPTF (m)

1

77786

(10)

6

100

0

-66

Adapter, Union,  3/8 '' NPTF

1

172207-1

(9)

7

338371

Cover Assembly

1

Includes items 8-11

315669

(5)

8

Washer, 1/4 ''

3

328030

(2)

9

Washer, Lock, 1/4 ''

3

328034

(3)

10

Screw, Cap, 1/4 '' -20 x 1/2''

3

331380-A5

(1)

11

48018

Screw, Thumb, 1/4 '' -28 x 1-1/8 ''

3

338371

(7)

12

338802

Plate, Follower

1

338802

(12)

Legend:

Part numbers left blank (or in italics) are not available separately

Assembly

NOTE: Refer to Figure 2 for component
identification on all assembly procedures.

CAUTION

Select a clean environment for all assembly proce-
dures. Prevent contamination from foreign mate-
rial. Damage to components can occur.

 
          

IMPORTANT: Make sure to remove the pro-
tective cover from the inlet of Pump Assem-
bly (1). 

Do not apply thread sealant to the first two
(2) threads of any connection. Contamina-
tion can occur.

  1. Screw Union Adapter (6) [with thread sealant] into 

Adapter (5) as required.
• Tighten the Union Adapter securely.

     •  Screw into pump outlet

  2. Install Pump Assembly (1) into Cover (7).

  3. Secure the Pump Assembly to the Cover with 

Washers (8), Lock Washers (9), and Cap Screws (10).
• Tighten the Capscrews securely.

  4. Place Follower Plate (12) onto the top of the product.

• With a wobbling motion, eliminate any air that may 

be trapped underneath the Follower Plate. Force the 
product through the hole in the center of the Plate.

  5. Guide the pump tube into the Follower Plate and fit the 

Cover onto the container.

  6. Secure the Cover to the container with Thumb 

Screws (11).

  7. Test/Prime the Pump assembly. 

• Refer to Service Guide SER 331380-A5 for details.

Changes Since Last Printing

New Format

Отзывы: