background image

2

CONTENTS

1.  RECOMMENDATIONS AND SAFETY INSTRUCTIONS ..........................................................................................4

1.1. Personal safety ...................................................................................................................................................4
1.2. Precautions for installation and maintenance ................................................................................................4

2. INSTALLATION ..........................................................................................................................................................5

2.1. General information ...........................................................................................................................................5
2.2. Transport on site ................................................................................................................................................5
2.3. Parts supplied with the unit ..............................................................................................................................6

2.3.1. Water coil option

 ....................................................................................................................................................

6

2.4. Installation of the unit ........................................................................................................................................6

2.4.1. General information

 ...............................................................................................................................................

6

2.4.2. Exterior version

 ......................................................................................................................................................

6

2.5. Airflow direction

 ................................................................................................................................................

7

2.5.1. Right-hand version

 ................................................................................................................................................

7

2.5.2. Left-hand version

...................................................................................................................................................

7

2.6. Installation of the temperature probe (air supply sensor)

 ..............................................................................

7

2.7. Fitting of options/accessories

..........................................................................................................................

8

2.7.1. Installation of adapters .................................................................................................................................9

2

.7.2. Installation of hoods

 ..............................................................................................................................................

9

2.7.3. Installation of air inlet/outlet damper

 ...................................................................................................................

9

2.7.4. Connection of standard flexible sleeves

 ...........................................................................................................

11

2.7.5. Connection of the CO2 sensor

 ..........................................................................................................................

11

2.7.6. Internal water coil option

 ....................................................................................................................................

12

2.7.7. Constant pressure option

 ...................................................................................................................................

13

2.8. Hydraulic connection .......................................................................................................................................14

2.8.1. Connecting condensates general ..............................................................................................................14
2.8.2. Connecting condensates heat exchanger .................................................................................................14

2.9. Connection to the electrical supply ...............................................................................................................15

2.9.1. Control - Power principle ...........................................................................................................................15
2.9.2. Electrical cable connections - power or control  .......................................................................................16
2.9.3. General power connection (single-phase) of the unit ................................................................................16
2.9.4. Defrosting coil or heating coil power connection (optional) .......................................................................17

2.10. Servicing filters ..............................................................................................................................................17

2.10.1. Filter replacement following timer ............................................................................................................17
2.10.2. Filter replacement following clogging indicator .......................................................................................17

2.11. Remote control communication ...................................................................................................................18

2.11.1. Remote control use ..................................................................................................................................18

Содержание VEX400

Страница 1: ...www aldes com VEX400 Installation and maintenance manual EN...

Страница 2: ...s 9 2 7 3 Installation of air inlet outlet damper 9 2 7 4 Connection of standard flexible sleeves 11 2 7 5 Connection of the CO2 sensor 11 2 7 6 Internal water coil option 12 2 7 7 Constant pressure o...

Страница 3: ...ONS 19 3 1 Unit dimensions 19 3 2 Outside accessory dimensions 19 3 2 1 Roof cowl 19 3 2 2 Rain hoods 20 3 2 3 Shut off dampers 20 3 2 4 Adapter drawings 20 3 2 5 Flexible sleeve drawings 21 4 CONTROL...

Страница 4: ...2 9 4 of the installation manual The product s power supplies must be switched off before any maintenance or cleaning operation Make sure that the unit cannot start running accidentally If one of the...

Страница 5: ...30 screws M6 The unit s rating plate is duplicated One plate is located on the back of the quick access hatch and another on the side panel The unit is packed in plastic film protected with cardboard...

Страница 6: ...probes transparent tubes and pressure taps are pre connected on stand by in the side rail air supply side All the notices for the use of the unit are behind the new air filter access door An SD board...

Страница 7: ...installation and Section 3 for the dimensions 2 5 Airflow direction There is a right hand and a left hand version 2 5 1 Right hand version Fresh air Discharge Extraction Air supply Fresh airflow towar...

Страница 8: ...onents to guarantee a uniform temperature in the section Drill a hole between 21 mm and 30 mm in the duct so that the probe and gland can be threaded through Apply a bead of mastic to the metal plate...

Страница 9: ...rged air towards fresh air plan for at least 4 mm between the air inlet and outlet see DTU 68 3 part 1 1 4 for residential buildings For service buildings the RSDT makes it mandatory for the extract a...

Страница 10: ...r Three way connector Junction box Towards terminal block Towards damper Damper servomotor cable RG cable Damper servomotor cable Damper servomotor cable RG cable Once this wiring has been completed s...

Страница 11: ...s one female outlet and a module OJ Air LON The assembly is pre wired and factory fitted at the connection terminal block Connect the cable RJ12 labelled R11 on stand by in the side rail to one of the...

Страница 12: ...on outside equipment or equipment located in a moist environment must be watertight It is recommended to protect the connections between the servomotor cable and the Water Bat cable by at least class...

Страница 13: ...tubes are equipped with pressure taps and identified by a pression insufflation supply pressure label to measure the air supply pressure and pression extraction extract pressure to measure the extract...

Страница 14: ...with diaphragm Condensate evacuation direction nit Watch out for the risk of frost in winter plan to insulate the water trap and the evacuation manifold if they are in an unheated atmosphere 2 8 2 Co...

Страница 15: ...forget to connect the earth 2 9 1 Control Power principle Every unit has an electrical connection box on the front panel This box gives access to the electrical power and control components disconnect...

Страница 16: ...power cable conductors that are rigid or fitted with end pieces are screwed in the fixed body of each switch 2 9 3 General power connection single phase of the unit Thread the power cable through the...

Страница 17: ...lable timer or a clogging indicator sold as an option filter fouling 2 10 1 Filter replacement following timer This timer according to the factory setting will trigger after three months the user can...

Страница 18: ...lacement following timer The remote control is fitted with a display a confirm button two navigation buttons or and eight indication LED Please refer to the configuration guide to configure the machin...

Страница 19: ...fixing F x G mm Weight kg VEX410 1505 578 628 904 440 x 240 160 VEX420 1822 578 628 1157 440 x 340 205 VEX430 1825 910 954 1157 740 x 340 291 VEX440 2166 910 954 1468 640 x 440 366 3 2 Outside accesso...

Страница 20: ...25 3 2 3 Shut off dampers F 85 130 4 x 1 0 D B C A E A mm B mm C mm D mm E mm F mm VEX 410 270 470 240 440 210 410 VEX 420 370 470 340 440 310 410 VEX 430 370 770 340 740 310 710 VEX 440 470 670 440 6...

Страница 21: ...21 3 2 5 Flexible sleeve drawings D B C A E A mm B mm C mm D mm E mm VEX 410 270 470 240 440 250 VEX 420 370 470 340 440 315 VEX 430 370 770 340 740 355 VEX 440 470 670 440 640 500...

Страница 22: ...4 of the connection diagram above and configuration guide CO2 probe control of the fan speed according to the CO2 concentration level in the room to be treated see terminal block 4 of the connection d...

Страница 23: ...23 NOTES...

Страница 24: ...www aldes com 11072615 A 12 2019 RCS 956 506 828 Imprim en France Printed in France...

Отзывы: