Alderon Industries Versa'larm VA02A Скачать руководство пользователя страница 2

Versa’larm

Operation, Maintenance and Installation Manual

2-Zone Alarm - Model VA02A | Sump and Flood

Installation of the Alarm Panel

1. To install/replace the battery for the backup power feature, remove the access cover (Fig. 1) and install 9 VDC battery 

(Duracell model MX 1604B2 / Fig. 2). After installing battery, the green power LED should illuminate, then press and hold 

the “Alarm Test” pushbutton (Fig. 3) to activate the alarm and make sure the battery is working properly. The buzzer should 

annunciate and the alarm LEDs should illuminate. If using the auxiliary contacts, leave the access cover off until step 3 is 

completed. If the auxiliary contacts are not used, replace the access cover (Fig. 4).

(Fig. 1)

(Fig. 2)

(Fig. 3)

(Fig. 4)

2. Determine the mounting location for the alarm panel. Make sure power outlet (120 VAC, 50/60 Hz) is within 5-feet of the 

alarm panel (Fig. 5). The power outlet should be on a separate circuit breaker from any other device and not on a switched 

receptacle to maintain power integrity. Mount the alarm panel using two #6 self-tapping screws (not included / Fig. 6). Use 

two #8 plastic anchors (not included / Fig. 7) if mounting the alarm panel to sheet rock.

(Fig. 5)

(Fig. 6)

(Fig. 7)

5 ft. Max

Alderon Industries - Hawley, MN  |  218.483.3034  |  [email protected]  |  alderonind.com

Alarm Systems

Control Panels

Float Switches

Leak Detection Systems

Page 2 of 4