ALCOMEXINDO ALUSCAFF D1F-0114-02-MF Скачать руководство пользователя страница 4

DIMENSION

3, COMPONENT DESCRIPTION

ITEM

PICTURE

NAME

USAGE

DIMENSION

(

 

mm

 

)

6

Base frame
fence

To fix base frame at the beginning of 
scaffolding erection

-

7

Guardrail
Frame

The protection of users at final level

930 x 750

8

Telescopic

To increase stability of scaffolding

-

9

Adjustable

To level scaffolding after moving or 

9

Adjustable

erection

-

10

Base Frame

To consist base section by 
assembling

1300 x 750

10

Base Frame

assembling
Adjustable leg

1300 x 750

PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE

Copy Right 2012 - By Alcomexindo 021-8831036

(3)

Содержание ALUSCAFF D1F-0114-02-MF

Страница 1: ...DOUBLE WIDTH SINGLE WIDTH PLEASE READ THIS INSTRUCTION CAREFULLYBEFORE USE Copy Right 2012 By Alcomexindo 021 8831036 ALUMINIUM COMPANY EXTRUSION INDONESIA...

Страница 2: ...S2F 0114 03 MF 1870 750 5380 D2F 0114 04 MF 1870 1350 5380 S3F 0114 05 MF 1870 750 7470 D3F 0114 06 MF 1870 1350 7470 S4F 0114 07 MF 1870 750 9550 D4F 0114 08 MF 1870 1350 9550 S5F 0114 09 MF 1870 75...

Страница 3: ...ower frame with the opposite upper frames 2400 Brace opposite upper frames 3 Interlock clip To lock lower frames and upper frame clip frame 4 8 rung frame To increase the height of scaffolding 2080 x...

Страница 4: ...otection of users at final level 930 x 750 8 Telescopic To increase stability of scaffolding 9 Adjustable To level scaffolding after moving or 9 Adjustable erection 10 Base Frame To consist base secti...

Страница 5: ...4 SPECIFICATION PART ITEM PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE Copy Right 2012 By Alcomexindo 021 8831036 4...

Страница 6: ...vices to Alcomexindo Aluminium Scaffolding to lift loads Never use damaged or in correct components Brake all castors by pushing down the brake lever Only erect a Alcomexindo Aluminium Scaffolding on...

Страница 7: ...do Aluminium Scaffolding onto other constructions When the wind force is 6 and above moves Alcomexindo Aluminium Scaffolding to a wind sheltered area or secure against tipping over by anchoring it Cli...

Страница 8: ...7 SAFETY RULES SYMBOLS SAFETY PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE Copy Right 2012 By Alcomexindo 021 8831036 7...

Страница 9: ...especially power cables The ground shall be level hard and generally level enough level enough Alcomexindo Aluminium Scaffolding should only be moved by manual effort Do not move Alcomexindo Aluminiu...

Страница 10: ...r second 25 m p h tie the tower to a rigid structure If the wind is likely to reach gale force over 18 meters per second 407 7m s 17 m p h m p h the tower should be dismantled tower should be dismantl...

Страница 11: ...Al i i S ff ldi t d i d t b lift d d d l f t Alcomexindo Aluminium Scaffolding are not designed to be lifted or suspended please refer to your supplier for advice e Stabilizers Ballast Stabilizers sh...

Страница 12: ...he Alcomexindo Aluminium Scaffolding can be moved to the proposed site of use ground gradient must not exceed 3 Carry out the following work steps to move the scaffold tower system To move the scaffol...

Страница 13: ...on 1 Alcomexindo Aluminium Scaffolding can be erected as a centered erection 2 Horizontal and diagonal braces are fastened by means of snap locks which engage during erection and which are secured aga...

Страница 14: ...the packaging material according to regulations Check that all parts of the Alcomexindo Aluminium Scaffolding are present according to section 5 Read the erection instruction WARNING never work from...

Страница 15: ...ace onto the rungs of base section Then insert a 8 rung frame into the vertical tube of Then insert a 8 rung frame into the vertical tube of base section always make sure braces are fully locked in po...

Страница 16: ...m Full Assy WARNING Never work from or build or dismantle the tower system an unguarded platform DISMANTLING NOTE the dismantling of the Alcomexindo Aluminium Scaffolding is in the reverse order of er...

Страница 17: ...the mobile scaffold tower components Frame base frame 8 rung frame guardrail frame 9 Inspect for deformation crushing and cracks if a deficiency is discovered do not use the frame Braces diagonal hori...

Страница 18: ...rage 9 The scaffold tower system components must be stored in such a way that they are not damaged 9 During Storage the scaffold tower components must be protected against the effects of weather Store...

Отзывы: