
L1&L2
Service
Manual
TCL
Communication Ltd.
Rev.: 1.0
Venice 5048A_I_U_Y & 5148A_I Level 1 & Level 2 Service Manual
Page: 27/32
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
Note: Please do not dirty the FPC contact area(in golden) during assembly process, or receiver may
function will not work properly.
9) While assemble screws on the frame, please pay attention to the 2 kinds of screws and screw
torque.
Screw with
Red Circle
Screw Torque: 0.6kgf·cm
Screw with
Blue Circle
Screw Torque: 0.7kgf·cm
Note: please remember to assemble the screw under Fingerprint module.
7.
Dual camera repair process
7.1. Dual camera on Venice
Separated Dual cameras= Main Main2 camera
Main2 camera
Main camera