OmniAccess SafeGuard Controller Installation Guide
26
Chapter 2: Site Preparation and Installation
Four-Post Rack
To install the SafeGuard Controller in a four-post rack, follow these steps:
1
Lift the controller carefully from the packing material, and set it on a level work
surface.
2
Using the screws from the mounting accessory kit, attach the rack-mounting
brackets, as shown in
Figure 7 Attaching the Rack-Mounting Brackets at the Front
3
Slide the controller into the rack, and align the mounting holes.
4
Using screws appropriate to the equipment rack, attach the brackets to the rack, as
shown in
CST_005
Содержание OmniAccess SafeGuard
Страница 6: ...Figures OmniAccess SafeGuard Controller Installation Guide 6...
Страница 8: ...Tables OmniAccess SafeGuard Controller Installation Guide 8...
Страница 9: ...Preface In this preface About This Guide Related Publications Guide Organization...
Страница 12: ...OmniAccess SafeGuard Controller Installation Guide 12 Preface...
Страница 40: ...OmniAccess SafeGuard Controller Installation Guide 40 Appendix A Technical Specifications...
Страница 46: ...OmniAccess SafeGuard Controller Installation Guide 46 Appendix B Safety and Regulatory Compliance...
Страница 47: ...appendix C Customer Assistance and Product Support...
Страница 52: ...OmniAccess SafeGuard Controller Installation Guide 52 Index...