
OPERATION
SWINGTRIM 03/09
Operation Section 4-16
© 2009 Alamo Group Inc.
OPERA
T
ION
Sickle Bar PRE-OPERATION Inspection
Mower ID# ________________
Make ____________________
Date:
________________
Shift
____________________
Before conducting the inspection, make sure the tractor engine is off, all
rotation has stopped and the tractor is in park with the parking brake
engaged. Make sure the mower is resting on the ground or securely blocked
up and all hydraulic pressure has been relieved.
Operator’s Signature:
Item
Condition at
Start of Shift
Specific Comments if
not O.K.
SICKLE BAR MOWER
The Operator’s Manual is in the Canister on the mower
All Safety Decals are in place and legible
The Mounting frame bolts are in place and tight
The Sickle bar connection bolts & pins are tight
There are no cracks in bar or frame
The Hydraulic Cylinders pins are tight
The Hydraulic Valve hose connections are tight
There are no leaking or damaged hoses
The Hydraulic Oil level is full
There is no evidence of Hydraulic leaks
The knives are not broken, chipped, cracked or bent
The clips, ledger plate & knives are properly adjusted
The Rock guards are in place and tight
The Hyd. motor mounting bolts are tight
The Knife drive gearbox has been lubricated
The Knife wear plates have been lubricated
The Skid shoes are in good condition & tight
DO NOT OPERATE an UNSAFE TRACTOR or MOWER
Содержание Swingtrim
Страница 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Страница 73: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION...
Страница 76: ......
Страница 77: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION...
Страница 95: ...OPERATION SWINGTRIM 03 09 Operation Section 4 19 2009 Alamo Group Inc OPERATION 8 2 Arm Controls...
Страница 111: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Страница 118: ...MAINTENANCE SWINGTRIM 03 09 Maintenance Section 5 8 2009 Alamo Group Inc MAINTENANCE CONTROL VALVE...
Страница 121: ...MAINTENANCE SWINGTRIM 03 09 Maintenance Section 5 11 2009 Alamo Group Inc MAINTENANCE HOSE CONNECTIONS...
Страница 123: ......
Страница 126: ...SWINGTRIM SOM 03 09 Printed in USA P N 00763548C...