background image

KIT CONTENTS (Fig. 1):

1) Replacement handle

2) Torx spanner

3) Fixing Screw

ASSEMBLY:

1)  Removal of existing red handle from the stabiliser 

lever arms:

a)  using the torx spanner provided, undo and remove the 

fixing screw located on the side of the red handle (Fig. 

2).

b) the red handle should now pull off the stabiliser lever 

arms (Fig. 3).

2) Fitment of new handle

a) ensure both stabiliser lever arms are level

b) Push the new handle on to the lever arms (Fig. 4).

c) Insert fixing screw and tighten using the torx spanner 

(Fig. 5).

The handle is now ready for use.

Part No: 1552888  Rev 07/09

1)

3)

Fig. 3

AL-KO Kober Ltd

South Warwickshire Business Park, Kineton Road, Southam, Warwickshire, CV47 0AL

           Phone: 01926 818500  

        Fax: 01926 818562  

                www.al-ko.co.uk

Fig. 1

2)

Fig. 2

Fig. 4

Fig. 4

Fig. 5

KIT CONTENTS (Fig. 1):

1) Replacement handle

2) Torx spanner

3) Fixing Screw

ASSEMBLY:

1)  Removal of existing red handle from the stabiliser 

lever arms:

a)  using the torx spanner provided, undo and remove the 

fixing screw located on the side of the red handle (Fig. 

2).

b) the red handle should now pull off the stabiliser lever 

arms (Fig. 3).

2) Fitment of new handle

a) ensure both stabiliser lever arms are level

b) Push the new handle on to the lever arms (Fig. 4).

c) Insert fixing screw and tighten using the torx spanner 

(Fig. 5).

The handle is now ready for use.

Part No: 1552888  Rev 07/09

1)

3)

Fig. 3

AL-KO Kober Ltd

South Warwickshire Business Park, Kineton Road, Southam, Warwickshire, CV47 0AL

           Phone: 01926 818500  

        Fax: 01926 818562  

                www.al-ko.co.uk

Fig. 1

2)

Fig. 2

Fig. 4

Fig. 4

Fig. 5

Отзывы: