© 2016 AKW
14
15-010-048-01
Deflector Screen Instructions
Technical Help line
01905 560219
Secure panels to the wall profile
Clip on profile and
panel cover caps
Screw cap covers
Finally check the
levels and operation.
i
i
Final Installation
Align the panel and deflector screen and
ensure these are level and inline before
drilling into final position.
1
2
From the inside
using a 2.8mm metal drill bit, drill through the wall profile into
secondary fixing holes into the panel. Secure the
panel into its
final position
using the 4x10 screws. Do not over tighten screws.
1
2
1
2