Functional Checks & Testing
Commissioning
It is important to complete the installation and record the commissioning
tests to provide a performance reference point for future tests.
Press and release the power button
Checking the Temperature Control
Checking the Flow Control
Checking the Power Button
Confirm the operation of the Temperature and Flow increase and
decrease knobs
Press the Power button to revert to standby mode
Содержание iSure
Страница 4: ...4 2015 AKW 14 009 033 07 ...
Страница 6: ...6 2015 AKW 14 009 033 07 ...
Страница 8: ...8 2015 AKW 14 009 033 07 ...
Страница 11: ...11 2015 AKW 14 009 033 07 ...
Страница 12: ...12 2015 AKW 14 009 033 07 ...
Страница 16: ...16 2015 AKW 14 009 033 07 ...
Страница 19: ...19 2015 AKW 14 009 033 07 ...
Страница 20: ...20 2015 AKW 14 009 033 07 ...
Страница 22: ...22 2015 AKW 14 009 033 07 ...
Страница 23: ...23 2015 AKW 14 009 033 07 ...
Страница 24: ...24 2015 AKW 14 009 033 07 LEFT OR RIGHT ...
Страница 29: ...29 2015 AKW 14 009 033 07 ...
Страница 30: ...30 2015 AKW 14 009 033 07 ...
Страница 31: ...31 2015 AKW 14 009 033 07 ...
Страница 32: ...32 2015 AKW 14 009 033 07 ...