background image

 
 

 

Fast the allen screws tightly and use two further screws per angle bracket at each side.  

 

   

 

 

 

  

 

 

Place the heating element(s.) Feed out the tube through the hole in the baseboard. See 
the instructions for Akva Vital Electronic heating element before continuing with the 
assembly. 
 

 

 

 

 

Fit the zipliner safety liner. Avoid creases and make sure the bottom is plain. 
 

                 

 

 

 

 
 

 

Place the water mattress(es) in the safety liner. See instructions for water mattresses. 
 

 

After filling with water, remove the air and add Long Life (water disinfectant.) Zip the 
top of the cover to the bottom of the cover. Begin at the head end. See also instructions 
for cover  

 
 

 

 

Отзывы: