background image

Page 2 

09/2021

User Manual
Extended Battery Pack 1kVA, 2kVA, 3kVA

INTRODUCTION

The publication and copyright of this documentation remain with the company:

AKKU SYS Akkumulator- und Batterietechnik Nord GmbH
Verbindungsweg 23 · 25469 Halstenbek / Hamburg · GERMANY
T49 4101 | 3 76 76-0 / Fax +49 4101 | 3 76 76-66
[email protected] / www.akkusys.de

Thank you very much,

for purchasing our a-TroniX series extended battery pack (EBP).
It can be added to the UPS a-TroniX series to extend the available battery time 

(see Table 0)

.

Up to four EBPs can be installed with the UPS.

Table 0
Approximate Battery Runtimes (in Minutes) at 100% Load (Tower Models):

Model  

Battery  Internal  Internal 

+

 

 

type 

battery 

battery 

1 BS  2 BS 

3 BS*  4 BS*

 

 

 

quantity   runtimes

1 kVA 

24 VDC 

 

15 

30 

45 

65

 

36 VDC 

 

25 

45 

65 

85

2 kVA 

48 VDC 

 

15 

30 

46 

65

 

72 VDC 

12V/9Ah 

25 

45 

65 

85

 

96 VDC 

 

35 

65 

85 

120

3 kVA 

72 VDC 

 

15 

30 

46 

65

 

96 VDC 

 

18 

40 

65 

85

Note: Battery times are approximate and vary depending on the load 
configuration and battery charge.

* (options)

Read carefully before use!

Read this manual carefully before installation.
It contains important regulations and instructions for the use of this product and provides 
technical support for the operator of the unit.

All rights reserved.

AKKU SYS Akkumulator- und Batterietechnik Nord GmbH cannot be held responsible for 
any inaccuracies or inappropriate information in this instruction manual. The information in 
this document is subject to change without notice, but there is no obligation to update it on 
an ongoing basis.
We reserve the right to make design and equipment changes to improve the production 
process or the product.

Содержание 9885152

Страница 1: ...ge 1 EXTENDED BATTERY PACK User Manual 1kVA bis 3kVA Tower UPS Model Article number a TroniX Extended battery Pack 24V 9885152 a TroniX Extended battery Pack 48V 9885154 a TroniX Extended battery Pack 72V 9885155 ...

Страница 2: ... 1 kVA 24 VDC 2 3 15 30 45 65 36 VDC 3 5 25 45 65 85 2 kVA 48 VDC 4 3 15 30 46 65 72 VDC 12V 9Ah 6 5 25 45 65 85 96 VDC 8 7 35 65 85 120 3 kVA 72 VDC 6 3 15 30 46 65 96 VDC 8 5 18 40 65 85 Note Battery times are approximate and vary depending on the load configuration and battery charge options Read carefully before use Read this manual carefully before installation It contains important regulatio...

Страница 3: ...structions and the corresponding laws during installation operation and maintenance otherwise personal injury or damage to the equipment may occur The safety instructions in this manual serve as a supplement to the local safety instructions Our company accepts no liability for damage caused by failure to observe the safety instructions WARNING This UPS contains its own energy source batteries The ...

Страница 4: ...age CAUTION General warning of danger points NOTE This symbol indicates texts notes or tips Failure to take precautionary measures may result in damage to the product and or its functions or to an object in its vicinity ENVIRONMENT Indicates assemblies or parts that must be disposed of properly Do not dispose of them in the household waste Take advantage of the certified and professional recycling...

Страница 5: ...a claim for concealed damage Check the battery recharge date on the shipping carton label If the date has passed and the batteries were never recharged do not use the EBP Contact your supplier The packaging is recyclable After unpacking please keep it for reuse or dispose of it properly Check the accessories against the packing list and contact the dealer if any parts are missing Accessories inclu...

Страница 6: ...VA 3kVA Battery installation Connect the batteries in their battery cabinet according to the following Figure 1 Figute 1 Battery installation for a TroniX Extended Battery Pack 72V for a TroniX Extended Battery Pack 48V for a TroniX Extended Battery Pack 24V ...

Страница 7: ... battery connectors Do not remove the clip from the second battery connector on the last EBP Retain the clips CAUTION A small amount of arcing may occur when connecting an EBP to the UPS This is normal and will not harm personnel Insert the EBP cable into the UPS battery connector quickly and firmly 4 Plug the EBP cable s into the battery connector s as shown in Figure 2 Up to four EBPs may be con...

Страница 8: ...e setting of battery numbers and type Use the up and down buttons to select the number of battery strings according to your UPS configuration Figure 3 Battery number configuration All UPS and EBP Cabinets Number of Battery Strings UPS only internal batteries 1 default USV 1 Extended Battery Pack 3 USV 2 Extended Battery Packs 5 USV 3 Extended Battery Packs 7 USV 4 Extended Battery Packs 9 NOTE The...

Страница 9: ...llowing precautions 1 Remove watches rings or other metal objects 2 Use tools with insulated handles 3 Do not lay tools or metal parts on top of batteries 4 Wear rubber gloves and boots When replacing batteries replace with the same type and number of batteries or battery packs Proper disposal of batteries is required Use the service of our AkkuSys team to order new batteries The batteries must be...

Страница 10: ... seconds The LED indicators of the front panel stop cycling when the test is completed Recycling used battery Do not dispose of batteries in a fire Batteries may explode Proper disposal of batteries is required Refer to your local codes for disposal requirements Do not open or mutilate batteries Released electrolyte is harmful to the skin and eyes It may be toxic Do not discard waste electrical or...

Страница 11: ... 5V 55 82 5 110 0 5V 82 5 110 0 5V OUTPUT DC Current 1 4 A Output Protection Fuse Battery Type sealed maintenance free valve regulated 2 strings of 2 2 strings of 4 2 strings of 6 12V 9 Ah 24V 12V 9Ah 48V 12V 9Ah 72V BATTERIY Battery Type 2 strings of 6 EBP 2 strings of 3 12V 9Ah 72V 2 strings of 8 12V 9Ah 36V 2 strings of 8 12V 9Ah 96V 12V 9Ah 96V Recharge Time 8 hours to 90 ACCESSORY User Manual...

Страница 12: ...echnik Nord GmbH Verbindungsweg 23 25469 Halstenbek Hamburg GERMANY Tel 49 4101 3 76 76 0 Fax 49 4101 3 76 76 66 info akkusys de www akkusys de Other manufacturers and product ranges you will find in our AKKU SYS complete catalogue Go to our catalogue ...

Отзывы: