Akicon 41518 Скачать руководство пользователя страница 4

3

2

2-2

If  necessary,  tighten  screws  using  a  crosshead 

screwdriver  until  the  faucet  is  firmly  connected  to 

the sink. 

2-3

Place  Mounting  Nut,  Metal  Washer  and  Rubber 

Washer  over  Valve  Shank.    From  underside  sink, 

insert  valve  body  through  mounting  holes.  The  hot 

valve,  labeled  with  red  tag  should  be  positioned  to 

the left side of the spout. 

From  underneath  sink,  tighten  Mounting  Nut 

by  Tool .  Before  final  tightening,  make  sure 

V al v e  B o d y  S i d e  C o ] n n e c t o r   f a c i n g   S p o u t 

B o d y .  

2-4

2-5

From  underneath  sink,  tighten  Mounting  Nut 

by  Hand.  Before  final  tightening,  make  sure 

V al v e  B o d y  S i d e  C o n n e c t o r   f a c i n g   S p o u t 

B o d y .  

3

Connect hot and cold water flexible hoses to faucets inlets.

Connect  Spout  hot  water  flexible  hoses  to  the  Left 

Valve  Side  Connector.  Tighten  flexible  hoses  Nut. 

Connect  Spout  cold  water  supply  line  to  the  right 

Valve Side Connector.

3. Water Supply Line Connections

4. POP-UP Assembly Installation 

As  shown.  Insert  Flange  with  Washer  through  Sink 

drain Hole. From underside, thread Drain Body into 

Flange. Holding the drain body in position with Ball 

Rod  Opening  facing  back,  tighten  Metal  Locknut 

securely. Thread Drain Tailpiece into Drain body. 

2-6

HOT

HOT

COLD

HOT

COLD

COLD

INSTALLATION PROCEDURES

1

2-1

You  should  clean  all  the  dirts  from  valve  outlets. 

Turning  off  the  water  supply  valves.  This  is  usually 

found near the water meter. If you are replacing an 

existing faucet, remove the faucet from the sink and 

clean the sink surface thoroughly.

1. Turn Off Water Supply

2. Install Faucet

Be sure that O-Ring is placed to the bottom of the

spout body. lnsert Spout Shank through the center

hole of sink. From underneath sink, place Plastic 

Washer and Metal Washer onto spout shank and 

tighten with Mounting Nut by hand.Before final 

tightening, be sure Pop-up Holefacing back.

90

90

Clos

e

 

Hot

Clos

e

Cold

Open

Open

5.

 Valve Function

By rotating the handle closed to the spout, the Valve 

will  be  activated  allowing  water  to  flow. The  water 

flow will increase by continuing to rotate  handle. By 

rotating  the  right    handle  to  the  left,  the  water 

temperature  will  decrease  to  cold  flow  only.  By 

rotating  handle  left  to  the  right,  the  water 

temperature will increase to hot  only.

6.

 Faucet  Start Up

After  installation  is  complete,  remove 

aerator  and  rotate  handle  to  the  close 

position. Turn on the Water Supply Valves, 

and  check  all  connections  for  leak.  Turn 

on your faucet and allow both hot and cold 

water  to  run  at  least  one  minute  each. 

Replace Aerator.

MAINTENANCE AND CARE

Отзывы: