background image

08182020JA                                     

       

www.akiascreens.com     

                  

U-00205 

Step 5

: Secure the elbow joints by fastening them with 

M4x7 screws (g)

, 4 at each corner. 

 

 

 

 

 

 

 

 

Screen Material  

 

 

 

 

 

 

TWO PERSON SETUP

 

Step 6: 

Carefully and gently place the assembled frame on top of the screen material in the marked areas as shown 

below. Make sure to not allow the angle edge of the frame to come in direct contact with the screen material to  

avoid puncturing it. 

 

 

 

 

 

 

 

 

 

Step 7: 

Hook one end of the spring and secure inside the groove of the frame, use the 

spring hook (h)

 to attach the 

spring to the hole located on the screen material’s outer edge in the following order. 

 

 

 

 

 

 

 

 

 

 

 

2. Hardware Parts List 

a. 

b. 

c. 

d. 

e. 

f. 

g. 

 

h. 

j. 

k. 

l. 

m. 

*Make sure the frame corners are positioned 

in the marked areas of the material. 

g. 

h. 

i. 

CAUTION! 

THE  PROJECTION  FABRIC  IS  A  DELICATE  OPTICAL/LENTICULAR  SCREEN  MATERIAL  AND  SHOULD  NOT  BE 
FOLDED, BENT, OR CREASED. ALWAYS MAINTAIN SCREEN MATERIAL FLAT AND TAUT DURING SETUP AND 
DISASSEMBLY. TWO PEOPLE ARE REQUIRED TO SETUP AND INSTALL THE MATERIAL TO AVOID PERMANENT 
DAMAGE. ANY DAMAGES TO THE SCREEN MATERIAL WILL VOID YOUR WARRANTY. 

 

Содержание EDGE FREE CLR 3/4 Series

Страница 1: ...scratches on the projection screen surface will affect the quality and performance of the projection image Follow the instructions below to properly maintain the screen 1 The screen surface has a horizontal linear structure DO NOT wipe the screen up and down or in a circular motion Wipe gently from left to right only 2 Clean the dust on the screen surface with a soft brush or microfiber cloth A ro...

Страница 2: ...e Trim Parts List Qty Item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a M4 4 b D5 4 c M4 4 d D5 4 e M4 4 f M4 4 g h i j k l m n o p q ...

Страница 3: ...izontal frame sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Item Parts List 103 123 a Center Joints M4 bottom position 2 2 b Center Joints D5 top position 2 2 c Elbow Joints M4 bottom position 4 4 d Elbow Joints D5 top position 4 4 e Side cover Center Joints M4 2 2 f Side cover Elbow Joints M4 4 4 g M4x7 Screws 24 24 h Sp...

Страница 4: ...ook one end of the spring and secure inside the groove of the frame use the spring hook h to attach the spring to the hole located on the screen material s outer edge in the following order Make sure the frame corners are positioned in the marked areas of the material g h i CAUTION THE PROJECTION FABRIC IS A DELICATE OPTICAL LENTICULAR SCREEN MATERIAL AND SHOULD NOT BE FOLDED BENT OR CREASED ALWAY...

Страница 5: ... material are not properly wrapped along the edge of the frame leaving the material with unbalanced tension and an uneven finish To correct detach springs from material at the corner s where material does not lie flat along the edge of the frame reposition the material so that it lies flat and wraps along the edge of the frame and reattach springs to the material Center Support Bar Step 8 Insert t...

Страница 6: ...right sides edge trim frames d using the elbow joints f and secure with four M4x4 screws m on all corners Step 2 Step 10 Install the angle cover n on each corner of the frame using the M4x4 screws m Note The angle cover screws holes align with the screw holes on the elbow joint 1 1 2 2 2 2 f m e m n Tear off the double sided tape ATTENTION The back of the material has labels indicating the TOP and...

Страница 7: ...frame Notice to Installer Material Tip Proper Projector Placement for CLR 3 4 The CLR 3 4 is exclusively for table mounted ultra short throw projectors Overhead placement or a standard projector will make the image very dark on account of the screen s absorbent layer deflecting light that is not aligned with its reflective angle q ...

Страница 8: ...w wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Step 14 Position the fixed frame screen onto the top wall brackets as shown below and push down at the center of the top of the frame to secure For Technical Support or an Akia contact in your area visit www akiascreens com Model Size X Wall bracket distance X1 Bracket hole distance Y Top Bottom...

Отзывы: