
21
Keep at due distance from the bike carrier /bike and the tail pipe of the car in
order to avoid any damages due to the excessive heat.
Phase 2
Now you have to open the quick stop system Fig.A.
Afterwards you can connect the rear towbar bike carrier to the towing hitch and you have to lift it
slightly Fig.B.
Now you have to push down the quick stop system Fig.C.
9. HoW to FIt tHe bIkeS on tHe bIke carrIer
Warning
: before fitting bikes on to the bike carrier, switch off the engine, turn the ignition key to the
off position and apply the hand brake! The vehicle must be in a horizontal position.
Bikes are fitted on to the bike carrier different phases.
This chapter describes these phases in detail, in the succession required.