background image

AD20 TEST PROCEDURE 

Creation Date

2019/9/26 

Version 0.2 

 

 

1.

 

Introduction 

This document describes QC tests for AD20 

 

1.1

 

Confidentiality 

This specification is submitted by Yahorng to subcontractors on the understanding that its 

contents will not be transmitted to any third party without prior written consent from 

Yahorng 

 

1.2

 

Test software description 

 

During the test, the 

red 

graphic control element indicates that the test has not be en 

performed. 

Yellow

 and 

green

 graphic control elements indicate that the test is in progress . 

The 

blue 

graphic control element indicates that the test is correct . 

 

Содержание AD20G

Страница 1: ...t you are hereby notified that any review dissemination distribution or duplication of this document is strictly prohibited If you are not authorized please contact Akai Professional and destroy all c...

Страница 2: ...o the Manual shall be solely your responsibility and Akai Professional shall have no liability for any such repairs or service work All such service or repairs are performed at the sole risk of the pe...

Страница 3: ...E WITH ANY AKAI PROFESSIONAL DISTRIBUTOR OR AUTHORIZED REPAIR SERVICE CENTER IN THE PROVISION OF REPAIR SERVICES OR TO BE OR MAKE REPAIRS AS AN AUTHORIZED SERVICE CENTER ALL REPAIRS DONE BY ANY ENTITY...

Страница 4: ...stoves heat registers radiators or other heat producing equipment 7 Ventilation When installing the product make sure that the product has adequate ventilation Improperly ventilating the product may c...

Страница 5: ...oller Y Controller 1 configurable thumbstick with 3 modes Inputs Outputs Inputs Outputs Inputs Outputs Inputs Outputs 1 USB port 1 1 4 6 35mm TS input for sustain pedal Power Power Power Power USB bus...

Страница 6: ...DISASSEMBLY PROCEDURES 1 DISASSEMBLE THE BOTTOM PANEL A REMOVE 20 PCS SCREW FROM THE BOTTOM PANEL Fig1 2 DISASSEMBLE THE KEYBOARD A REMOVE 2 PCS SCREW FROM THE KEYBOARD Fig2...

Страница 7: ...ASS Y AND MAIN PCB ASS Y A REMOVE 6 PCS KNOB FROM THE TOP PANEL B REMOVE 1 PC RUBBER PLUG 1 PC SCREW AND 1 PC STICK FROM THE TOP PANEL C REMOVE 2 PCS SCREW FROM THE JOYSTICK PCB ASS Y D REMOVE 12 PCS...

Страница 8: ...WIRING DIAGRAM US...

Страница 9: ...PACKING DIAGRAM US...

Страница 10: ...EXPLODE DIAGRAM US EQUENCIAL NO EXPLODE DIAGRAM WILL BE MARKED ON REF COLUMM OF BOM LIST...

Страница 11: ...1 2 PLAD2001 POLY FOAM L 1 2 PLAD2002 POLY FOAM R 1 1 PT15106258 Stick Black 1 3 1 PT1510631404 Button 6 Painting Laser etched 1 6 1 PT1510631504 Button 4 Painting Laser etched 1 15 1 PT15106333 KNOB...

Страница 12: ...15 4 RS000010J03 RES 0 5 SMD 0603 8 R55 R61 R70 4 RS001K10F03 RES 1K 1 SMD 0603 3 R27 R32 R52 4 RS001M10F03 RES 1M 1 SMD 0603 2 R7 R25 4 RS004710F03 RES 47 1 SMD 0603 3 R8 R9 R13 4 RS010010F03 RES 100...

Страница 13: ...3 VRR25201503 Potentiometer Rotary Volume 2 5KB Shaft 8 VR1 VR8 Length 15mm 360 2 TWPC19A008B01 Joystick PCB DIP assembly 1 7 3 OT10K N1B10K05N Pitch MOD STICK VR 1 VR9 3 TE812000411 Terminal 1 TE3...

Страница 14: ...AD20 TEST PROCEDURE Creation Date 2019 9 26 Version 0 2 AD20 Test Procedure Subject AD20 TEST PROCEDURE Creation Date 26 Sep 2019 Last Updated 4 Oct 2019 Version v0 2 Author Alex Tsai...

Страница 15: ...2 2 Table of Contents 1 Introduction 3 1 1 Confidentiality 3 1 2 Test software description 3 2 Component Test 5 2 1 Button Test 5 2 2 Keybed Test 5 2 3 VR Knob Test 5 2 4 OLED Test 6 2 5 Pedal Test 6...

Страница 16: ...n the understanding that its contents will not be transmitted to any third party without prior written consent from Yahorng 1 2 Test software description During the test the red graphic control elemen...

Страница 17: ...ANK PROG SELECT and plug in USB cable to enter test mode 1 2 2 Connection status and version confirmation If the Connect Status is green the connection to the AD20 device is successful and the version...

Страница 18: ...K clicks bright green then clicks bright red OP needs to visually check whether all LEDs are lighting normally 2 2 Keybed Test When pressed it will light green Pass When released it will light blue in...

Страница 19: ...reen and then released to show blue indicating that the test is completed 2 6 Joystick Test Turn the Joystick once it will show blue if tested in both directions 2 7 PAD Test When the pressing pressur...

Страница 20: ...AD20 TEST PROCEDURE Creation Date 2019 9 26 Version 0 2 7...

Страница 21: ...CAMtasticDXP TM...

Страница 22: ...CAMtasticDXP TM...

Страница 23: ...CAMtasticDXP TM...

Страница 24: ...CAMtasticDXP TM...

Страница 25: ...CAMtasticDXP TM...

Страница 26: ...CAMtasticDXP TM...

Страница 27: ...CAMtasticDXP TM...

Страница 28: ...CAMtasticDXP TM...

Страница 29: ...CAMtasticDXP TM...

Страница 30: ...CAMtasticDXP TM...

Страница 31: ...CAMtasticDXP TM...

Страница 32: ...CAMtasticDXP TM...

Страница 33: ...CAMtasticDXP TM...

Страница 34: ...2 COC23 PIC2401 PIC2402 COC24 PIC2501 PIC2502 COC25 PIC2601 PIC2602 COC26 PIC2701 PIC2702 COC27 PIC2801 PIC2802 COC28 PIC2901 PIC2902COC29 PIC3001 PIC3002 COC30 PIC3101 PIC3102 COC31 PIC3201 PIC3202 C...

Страница 35: ...8302 COC83 PIC8401 PIC8402 COC84 PIC8501 PIC8502 COC85 PIC8601 PIC8602 COC86 PIC8701 PIC8702 COC87 PIC8801 PIC8802 COC88 PIC8901 PIC8902 COC89 PIC9001 PIC9002 COC90 PIC9101 PIC9102 COC91 PIC9201 PIC92...

Страница 36: ...2 PISW1302a COSW13 PISW1401 PISW1401a PISW1402 PISW1402a COSW14 PISW1501 PISW1501a PISW1502 PISW1502a COSW15 PISW1601 PISW1601a PISW1602 PISW1602a COSW16 PISW1701 PISW1701a PISW1702 PISW1702a COSW17 P...

Отзывы: